Calculate your break-even point and break-even date
The calculator gives the break-even point, the margin of safety and the break-even date; nothing you enter leaves your browser. Enter the year’s revenue, variable costs (in €k or as a % of revenue) and fixed costs, all excluding VAT.
It assumes sales are spread evenly over a year starting January 1; the default values are those of the fictitious company in the example.
Fixed costs are covered on October 1. Beyond that point, every €100k of revenue adds €40.0k of profit, for a total of €1,200k over the year.
What is the break-even point?
The break-even point is the level of sales at which the margin earned on those sales exactly covers the year’s fixed costs. The break-even date is the day that level is reached.
A typical scenario: at the end of August, the CEO of an SME sees that the margin accumulated since January, €3,200k, does not yet cover the year’s €3,600k of fixed costs. Yet sales are on budget. Nothing is wrong: the company breaks even on October 1, and the year’s profit will be made in the last three months.
The mechanism rests on two types of costs. Variable costs move with the volume sold: materials and goods consumed, subcontracting, outbound freight, sales commissions. What is left of each sale, the contribution margin, first pays for fixed costs, or overhead, which are incurred regardless of volume: rent, support staff salaries, subscriptions, depreciation, interest.
The company in our example is fictitious. It sells €12,000k a year excl. VAT, with €7,200k of variable costs (60% of revenue) and €3,600k of fixed costs. Every euro sold therefore leaves it 40 cents toward its fixed costs.
The classic break-even chart shows where the revenue line crosses the total cost line.
To the left of the crossing, every sale reduces the loss; to the right, every sale adds to profit. The final gap, €1,200k, is the year’s profit.
Break-even point or break-even date?
The break-even point is an amount, in euros of revenue; the break-even date is a day, or a number of days. French usage blurs the two: Vernimmen, the reference corporate finance textbook in France, uses point mort for the level of activity at which “total revenue covers total costs,” in other words the break-even point itself, while many French SMEs use the same term for the date. On this page, the break-even point is the amount and the break-even date is the day.
How to calculate the break-even point
The calculation takes three steps: sort costs into fixed and variable, calculate the contribution margin and its ratio to revenue, then divide fixed costs by that ratio. The result is break-even sales, the break-even point in euros of revenue, from which the break-even date follows.
Contribution margin (CM)
= revenue − variable costs
= 12,000 − 7,200
= €4,800k
CM ratio
= CM ÷ revenue
= 4,800 ÷ 12,000
= 40%
Break-even point
= fixed costs ÷ CM ratio
= 3,600 ÷ 0.40
= €9,000k
Days to break even
= break-even point ÷ revenue × 365
= 9,000 ÷ 12,000 × 365
= 273.75 days, i.e., October 1The contribution margin ratio (CM ratio) is the contribution margin divided by revenue excl. VAT. Read it this way: out of every €100 of sales, €40 is left for fixed costs, then for profit. The other formulas follow from it:
| Metric | Formula | Example company |
|---|---|---|
| Break-even point in units | Fixed costs ÷ (unit price − unit variable cost) | €3,600,000 ÷ (€100 − €60) = 90,000 units |
| Break-even in months | Break-even point ÷ annual revenue × 12 | 9 months |
| Margin of safety | Revenue − break-even point | €3,000k |
| Margin of safety ratio | Margin of safety ÷ revenue | 25% |
| Profit | Contribution margin − fixed costs, or margin of safety × CM ratio | €1,200k |
| Revenue for a target profit | (Fixed costs + target profit) ÷ CM ratio | (3,600 + 600) ÷ 0.40 = €10,500k |
The break-even point in units assumes a single unit price and unit variable cost: here €100 and €60, for the same 40% ratio. With several products, work in euros, or calculate one break-even point per product.
Sorting costs: the real difficulty
Financial accounting does not make this split: in France, the income statement and the intermediate management balances classify costs by nature (purchases, external expenses, payroll). Break-even analysis requires reclassifying them by behavior, account by account, once, and then sticking to that classification.
These formulas come from management accounting practice (the variable costing method, also called direct costing); no official standard sets them. Some count the break-even date over a 360-day year: the company then reaches it on day 270, at the end of September, while the break-even point in euros does not change. Choose one convention and stick to it so your figures remain comparable.
Worked example: the company’s break-even point and date
This exercise uses the calculator’s values: €12,000k of revenue excl. VAT, €7,200k of variable costs and €3,600k of fixed costs. It asks for the break-even point, the break-even date, the margin of safety and the profit.
The starting point is the contribution margin income statement: the same costs as in the accounts, sorted into variable and fixed.
| Contribution margin income statement | €k | % of revenue |
|---|---|---|
| Revenue excl. VAT | 12,000 | 100% |
| − Variable costs | 7,200 | 60% |
| = Contribution margin | 4,800 | 40% |
| − Fixed costs | 3,600 | 30% |
| = Profit | 1,200 | 10% |
The solution, step by step:
- Contribution margin ratio: 4,800 ÷ 12,000 = 40%.
- Break-even point: 3,600 ÷ 0.40 = €9,000k of revenue.
- Break-even date: 9,000 ÷ 12,000 × 365 = 273.75 days. It is reached during day 274, on October 1, after 9 months.
- Margin of safety: 12,000 − 9,000 = €3,000k, or 25% of revenue.
- Profit: 4,800 − 3,600 = €1,200k, or 3,000 × 40%.
The last calculation is the most useful: every euro sold above break-even brings in 40 cents of profit. And to earn a profit of just €600k, €10,500k of sales would be enough.
How to interpret the break-even point
Read three figures together. The margin of safety says how far sales can fall, the break-even date says when the year turns profitable, and the contribution margin ratio says how much each extra sale brings in.
With a 25% margin of safety, the company can withstand a quarter of its sales disappearing before it loses money. At 5%, losing one customer is enough. A break-even date that slips later from one month to the next is a warning sign, even before the year-end close.
Operating leverage: why profit falls faster than sales
Operating leverage is measured by the degree of operating leverage: the percentage change in profit for a 1% change in revenue. It is the inverse of the margin of safety ratio: 1 ÷ 25% = 4 for the company.
If its sales fall by 10%, to €10,800k, the contribution margin drops to €4,320k and profit to €720k.
The ratio is indeed 4: fixed costs do not move, so every euro of lost margin comes straight out of profit. The higher the fixed costs, the stronger the leverage, on the way up as well as on the way down.
Which lever lowers break-even?
The contribution margin ratio is often the most powerful: two more percentage points, 42% instead of 40%, bring break-even down to €8,571k. For the same effect, fixed costs would have to be cut by €171k.
Conversely, any decision that adds a fixed cost raises break-even. A hire costing €100k fully loaded takes it from €9,000k to €9,250k (100 ÷ 0.40): it takes €250k of additional sales to pay for it.
If break-even exceeds revenue, the business loses money. There are three levers: sell more, raise the contribution margin ratio (prices, purchasing, product mix) or cut fixed costs. The calculator lets you test each one.
A seasonal business shifts the date
The calculator’s break-even date assumes sales are spread evenly over the year. If most sales fall in the spring, break-even comes earlier; if the business closes in August, later.
Suppose the company makes the same €12,000k in eleven months, selling nothing in August.
At the end of September, it has sold €8,727k instead of €9,000k: it does not break even until October 8. Only month-by-month cumulative revenue gives the true date.
In a restaurant, break-even is better expressed in covers: divided by the average check, then by the number of days open, it becomes a number of covers per day. The hospitality guide works through that conversion and also covers food cost percentage.
Mistakes that skew the break-even point
Almost every break-even calculation error comes from how costs are sorted or from mixing units. And a €300k error in break-even already moves the break-even date by 9 days, even though nothing has changed in the business.
Taking total costs as the break-even point
The most common mistake: adding variable and fixed costs, 7,200 + 3,600 = €10,800k, and calling that total the break-even point. It is the year’s revenue minus its profit, not the minimum you need to sell.
The total ignores the fact that variable costs fall when you sell less: at €9,000k of sales, they are only €5,400k. The false break-even point pushes the date back by eight weeks.
Confusing contribution margin with gross margin
Gross margin on goods sold deducts only purchases; the contribution margin also deducts freight, commissions and subcontracting. Suppose the €7,200k includes €6,000k of purchases: on gross margin alone, the ratio rises to 50%.
Break-even then drops to €7,200k and the break-even date to August 7, nearly two months too early. Yet the €1,200k of freight, commissions and subcontracting is incurred with every sale.
Classifying mixed costs differently from month to month
A phone plan, temporary staff and energy all have a fixed part and a variable part. If the company reclassifies €300k of temporary staff costs as fixed, its break-even point moves from €9,000k to €9,176k, without a single sale changing. Write the rule down, then apply it every month.
Applying a single ratio to different activities
The 40% ratio is an average. Suppose the company makes €8,000k from distribution (reselling goods) at a 25% margin and €4,000k from services at 70%. The sum checks out: 2,000 + 2,800 = €4,800k.
If the mix shifts toward distribution, break-even moves even though revenue does not.
With distribution at three quarters of revenue, profit shrinks from €1,200k to €750k on the same sales. Calculate one ratio per activity, or track the mix every month.
Mixing amounts with and without VAT, or misdating the fiscal year
Break-even is calculated excluding VAT, like costs: VAT collected is not margin. And if the fiscal year starts on July 1, the break-even date is counted from that day: day 274 of the fiscal year falls on March 31.
Believing that reaching break-even protects cash
Break-even analysis works with revenue and expenses, not with cash receipts and payments. A company that breaks even on October 1 can run short of cash in November if its customers pay on 60-day terms or if inventory builds up. The working capital requirement and the cash flow forecast complete the picture.
Tracking the break-even point every month
Break-even is recalculated with every budget and compared with actuals every month, using costs sorted once and for all. It is one of the basic tools of FP&A and management control, along with variance analysis.
A Power BI financial dashboard connects to the accounting system or the ERP. Contribution margin, fixed costs, cumulative revenue and the break-even date update with every month-end close.
Related metrics are covered in the management dashboard guide, and the break-even point has its own entry in the KPI library.
Three calculators take this one further: the margin calculator, by customer and by product; the cost price calculator, product by product; and the 12-month financial forecast.
The CEO in our end-of-August scenario no longer has to wait for the close to feel reassured: every month, they see how much revenue still separates them from break-even, and on what date they will cross it.
Frequently asked questions
How do you calculate the break-even point in units?
Divide fixed costs by the unit contribution margin: the selling price excl. VAT minus the variable cost of one unit. The example company sells each unit for €100 and incurs €60 of variable costs on it: €3,600,000 ÷ €40 = 90,000 units. With several products, calculate one break-even point per product, or use a weighted average unit contribution margin based on the sales mix.
How do you calculate the break-even point in Excel?
Put revenue excl. VAT in A2, variable costs in B2 and fixed costs in C2. Then add four formulas, for a fiscal year starting on January 1, 2026. Contribution margin ratio in D2: =(A2-B2)/A2. Break-even point in E2: =C2/D2. Days to break even in F2: =E2/A2*365. Break-even date in G2: =DATE(2026,1,1)+ROUNDUP(F2,0)-1. With the example company’s figures, E2 shows 9,000 and G2, formatted as a date, shows October 1, 2026.
What is the break-even point used for?
It tells you how much you need to sell before you make money, and therefore whether a project, a price or a new hire is viable. It is used to test a business plan before launch, to set a sales target and to measure the margin of safety. The example company can lose 25% of its sales before slipping into a loss.
Should the owner’s pay be included in fixed costs?
Yes: leaving it out is one of the mistakes flagged by Bpifrance Création, the French public investment bank’s service for business founders. In an incorporated company, the owner’s salary and the related payroll taxes are fixed costs. In a sole proprietorship, the owner’s pay is the profit: add the income you are aiming for to fixed costs, using the revenue formula for a target profit.
What is the financial break-even point?
It is the break-even point calculated “after taking financial expenses into account,” according to the French corporate finance textbook Vernimmen, whereas operating break-even “excludes any return on invested capital.” The company’s €9,000k is therefore a financial break-even point, since its interest expense is included in fixed costs. If that interest is €150k, operating break-even is 3,450 ÷ 0.40 = €8,625k, reached on September 20.
