Building a dashboard: steps, price, timeline and deliverables of a Power BI project

Published · Updated · 15 min read

Dylan Arnaud, founder of Datafuji

Building a dashboard means turning a recurring decision into a page of figures that updates itself. You name the meeting it serves, write down the rule for each metric, then connect the sources and have every figure validated. At Datafuji, a Power BI dashboard costs €3,000, €5,000 or €8,000 excl. VAT as a fixed-price package, with an indicative lead time of 2 to 4 weeks once access is granted.

How does building a dashboard work?

A build follows eight steps, from the first call to the warranty: each one produces a deliverable you can check and asks something of you. The build itself, from the data foundation to the pages, takes 2 to 4 weeks.

Let’s follow a fictional SME throughout: a 35-employee distribution company whose sales data sits in three tools (the CRM, the invoicing software and an Excel file of targets on SharePoint). It wants three pages, read by 8 people: an executive summary, the sales pipeline (deals in progress, not yet signed) and sales by customer.

Two terms come up throughout the project. A lot is a part of the work that is delivered, validated and invoiced separately; acceptance is your check that its figures are right.

StepWhat happensThe deliverableWhat you provideIndicative duration
1. First callYou describe the decision to support, your files and your tools. If a spreadsheet or your software’s built-in reporting is enough, we tell you so.A clear recommendation: a package, another solution, or nothing.The file or screenshot you use today, the list of your tools.30 minutes
2. QuoteYour requirements are written up as three lists (sources, pages, metrics and rules), then split into lots, each with its own price.A fixed-price quote.A review of the scope, a point of contact, your signature.As long as your approval takes
3. KickoffThe schedule is set in writing and access is tested.A lot-by-lot schedule.Read access to the sources and to your Power BI workspace.At Datafuji’s first availability after signature
4. Data foundationThe sources are connected and cleaned, the data model built (the tables and their relationships), the metrics calculated.Figures reconciled with known figures (one month of revenue, an accounting total), and the metric dictionary (the written rule for each one).Two or three reference figures, and your input on the rules.Roughly the first week
5. PagesThe pages are built on your real data and reviewed at the one-hour weekly check-in.Published pages, validated one by one.Your feedback, consolidated in writing.1 to 3 weeks depending on the package
6. AcceptanceYou check each lot; any deviation from the quote is corrected free of charge.An acceptance certificate per lot; the lot is invoiced once approved.An “OK” by email, or written reservations.Ten business days at most, five after a fix
7. Go-liveThe report is published in your workspace, the refresh scheduled, the permissions set.The online report, the source file, the documentation; a one-hour handover on request, within 30 days.Reader licenses, the workspace and, if needed, the data gateway (the software that connects Power BI to sources installed on your premises).With the last lot
8. AfterwardA reproducible defect reported in writing within 30 days of acceptance is fixed free of charge, unless it results from a change on your side or in your sources.A 30-day warranty after acceptance; optional post-delivery support, quoted separately.A report owner to keep it alive.30 days after acceptance

For the SME, with three sources and three pages, the indicative lead time is 3 weeks. Laid out on a calendar, the project can be read at a glance.

Timeline of a fixed-price Management package project for the example SME. Before week 1, in gray, your part: a 30-minute first call, quote and signature, access granted. Week 1: lot 1, the data foundation. Weeks 2 and 3: lot 2, the three pages. Acceptance of lot 1, in green, takes place while lot 2 is being built, in week 2; acceptance of lot 2 comes at go-live, within ten business days of its delivery, together with publishing and handover. Then the 30-day warranty after acceptance, shown dotted. The three-week lead time starts when access is granted.Timeline of a fixed-price Management package project for the example SME. Before week 1, in gray, your part: a 30-minute first call, quote and signature, access granted. Week 1: lot 1, the data foundation. Weeks 2 and 3: lot 2, the three pages. Acceptance of lot 1, in green, takes place while lot 2 is being built, in week 2; acceptance of lot 2 comes at go-live, within ten business days of its delivery, together with publishing and handover. Then the 30-day warranty after acceptance, shown dotted. The three-week lead time starts when access is granted.
Three weeks of build: lot 1 is accepted while lot 2 is being built.

The gray bars on your side, the call, the signature and the access, sit before week 1: that is where the schedule is won or lost.

The trap: starting with the pages

The order of steps 4 and 5 is not arbitrary. A page designed before the rules are written gets redesigned as soon as finance and sales discover that they don’t count revenue the same way.

That is why the rules are written before the pages, metric by metric: five to seven KPIs at most. Each one gets a written definition (calculation rule, source, frequency) and a point of comparison: target, budget or prior year. A KPI without a comparison triggers no decision; choosing metrics is covered in the KPI guide.

The design principles for the pages (one page, one question, always a point of comparison) are in the Power BI dashboard guide. Choosing each chart is a matter of data visualization.

What should you prepare before the build starts?

Nothing technical: eight pieces of information are enough to scope the project in 30 minutes. The most urgent is access to the sources, because the indicative lead time only starts once that access is granted.

  1. The decision to support, in one sentence: “the Monday sales review,” “the monthly executive committee.”
  2. The file, export or screenshot you use today, however imperfect: it is the best specification there is.
  3. The list of tools where the figures live: accounting software, CRM, ERP, industry-specific software, Excel or SharePoint files.
  4. Who can grant access to each tool: you, your IT department, the software vendor or a contractor.
  5. The readers, and what each one should or should not see.
  6. Two or three figures you know by heart: they will be used to check the report.
  7. Two names: the person who will approve the deliverables, and the person who will keep the report alive afterward.
  8. Your Microsoft 365 subscription: it shows whether your readers already have a Power BI Pro license.

Item 4 often determines the schedule. Suppose access to the SME’s CRM goes through the vendor, and the vendor takes two weeks to grant it. Requested on the day of signature, it pushes back the whole build; requested at the first call, it is ready when the project starts.

Two timelines of the same Management package project, over five weeks. Top: CRM access requested at signature, two weeks waiting for the vendor, in orange, then three weeks of build, go-live at the end of week 5. Bottom: access requested at the first call, build in weeks 1 to 3, go-live at the end of week 3. The gap between the two go-live dates: two weeks.Two timelines of the same Management package project, over five weeks. Top: CRM access requested at signature, two weeks waiting for the vendor, in orange, then three weeks of build, go-live at the end of week 5. Bottom: access requested at the first call, build in weeks 1 to 3, go-live at the end of week 3. The gap between the two go-live dates: two weeks.
Same project, same build: requesting access at signature costs two weeks.

The work hasn’t changed by a single hour; only the date of the request has moved. A request to a vendor or an IT department can take several weeks: send it before you sign.

How much does building a dashboard cost, and how long does it take?

At Datafuji, a Power BI dashboard costs €3,000, €5,000 or €8,000 excl. VAT, with an indicative lead time of 2, 3 or 4 weeks. The package depends on the number of pages (3, 6 or 10) and sources (2, 4 or 6).

PackagePrice excl. VATWhat it is forPagesSourcesIndicative lead time
Essential€3,000Replace the Excel file you rebuild every monthUp to 3Up to 22 weeks
Management€5,000Bring together figures from several toolsUp to 6Up to 43 weeks
Advanced€8,000Track targets, comparisons and forecastsUp to 10Up to 64 weeks

The price is written into the quote and doesn’t change; only an addition you request goes through a change order, which you accept beforehand. The line-by-line breakdown and the full offer are on the pricing page.

Which package fits your project?

The package is set by the more demanding criterion, pages or sources. A 3-page report on 5 sources is an Advanced package, just like an 8-page report on a single source: the larger of the two counts wins.

The grid shows it better than a rule.

Two-way grid: columns show the number of pages (1 to 3, 4 to 6, 7 to 10, more than 10); rows show the number of sources (1 or 2, 3 or 4, 5 or 6, more than 6). Each cell shows the package set by the larger of the two counts: Essential, €3,000 excl. VAT, 2 weeks; Management, €5,000 excl. VAT, 3 weeks; Advanced, €8,000 excl. VAT, 4 weeks; several packages beyond 10 pages or 6 sources. The example SME, 3 pages and 3 sources, falls in a Management cell, in blue; a 3-page report on 5 sources, in orange, is Advanced, not Essential.Two-way grid: columns show the number of pages (1 to 3, 4 to 6, 7 to 10, more than 10); rows show the number of sources (1 or 2, 3 or 4, 5 or 6, more than 6). Each cell shows the package set by the larger of the two counts: Essential, €3,000 excl. VAT, 2 weeks; Management, €5,000 excl. VAT, 3 weeks; Advanced, €8,000 excl. VAT, 4 weeks; several packages beyond 10 pages or 6 sources. The example SME, 3 pages and 3 sources, falls in a Management cell, in blue; a 3-page report on 5 sources, in orange, is Advanced, not Essential.
Three pages don’t make an Essential package: with three sources, the SME needs Management.

The SME has few pages but three sources to bring together: the number of sources sets its package.

Beyond 10 pages or 6 sources, the scope is split into several reports: each one is a package and becomes a lot of the quote, validated separately, with its own fixed price. The overall lead time is set in the quote.

The first-year cost

Licenses come on top of the package. In an SME, every reader of a shared report needs a Power BI Pro license, at €12.10 excl. VAT per user per month with annual billing (Microsoft’s public price in France). It is included in Microsoft 365 E5 and Office 365 E5.

Only a Microsoft Fabric capacity of F64 or above, designed for large organizations, lets readers do without a paid license. For the SME’s 8 readers:

Licenses = 8 readers × €12.10
  × 12 months
  = €1,161.60 excl. VAT per year,
  at French list prices
First year = 5,000 + 1,161.60
  = €6,161.60 excl. VAT
Later years = €1,161.60 excl. VAT
  excluding enhancements

The trap is comparing a package with the price of the software alone. Power BI Desktop is free; the real cost of a dashboard is the time spent building it, then maintaining it. Full license costs are covered in Power BI pricing.

What the fixed price includes

The price doesn’t just cover the pages. No deposit is required: each lot is invoiced once approved. Any deviation from the quote is corrected free of charge, until it complies. A one-hour video check-in every week can be booked whenever you like.

Access is read-only, and your data is never sent to an AI tool. Your readers’ licenses and the data gateway remain your responsibility.

What are the typical cases, and what is the trap in each?

Most projects fall into one of four cases: a first report on one or two sources, several tools to bring together, an Excel reporting workbook to replace, or a Power BI report to take over. Each has its own trap.

CaseStarting pointWhat changesThe trapMost common package
One report, one or two sourcesA table rebuilt every month from an accounting or sales export.The report updates itself; the monthly preparation time disappears.Trying to put everything in it: three well-chosen pages get read, ten don’t.Essential
Several sources to bring togetherSales in a CRM, invoicing elsewhere, targets in Excel.Pipeline and invoiced sales, target and actual, on the same page.Customer or product codes that differ from one tool to the next.Management or Advanced
Redesigning an Excel reporting workbookA heavy workbook, formulas only one person understands, copy-pasting every month.The rules are written down and shared; the workbook serves as the reference during acceptance.Copying the workbook as is instead of starting from the questions it answers.Depends on pages and sources
Taking over an existing Power BI reportA report that is slow, disputed, or built by someone who has left.A cleaned-up model, documented measures, a report people understand again.Adding pages on top of a fragile model.An audit first if the figures are disputed; otherwise, priced like a new build

The mapping table: the trap of multiple sources

The SME is in the second case. Its CRM has 1,310 accounts, its invoicing software 1,240 customers, and only 1,214 carry the same code in both tools.

Unmatched CRM accounts
  = 1,310 − 1,214 = 96
Unmatched invoiced customers
  = 1,240 − 1,214 = 26

The 96 CRM accounts are mostly prospects who haven’t been invoiced yet: that is expected. The problem lies with the 26 invoiced customers who can’t be found in the CRM, and with those among the 96 who are in fact the same customers under a different code.

Without a mapping table (the list that links each CRM customer code to its code in the invoicing software), their revenue disappears as soon as the page combines pipeline and invoiced sales. The table is built and validated in the first lot; after that, corrections are made in the tools, not in the report.

To decide between keeping Excel and moving to Power BI, see Power BI vs Excel. To see what the result looks like before starting the project, the dashboard guide presents 12 examples.

What should you receive at the end of a build?

The online report is only part of the deliverable: you also need the source file, the metric dictionary and an acceptance certificate for each lot, so that someone else can take the report over.

The handover package contains:

  • the report published in your own Power BI workspace, not the provider’s;
  • the source file (PBIX or PBIP, the two file formats Power BI Desktop saves in);
  • the documentation: metric dictionary, data model, report guide;
  • an acceptance certificate for each lot.

The dictionary gives each metric a written rule, validated in the first lot. Here is a fictional extract:

MetricCalculation ruleSourceChecked against
Invoiced revenue excl. VATInvoices issued minus credit memos, by invoice dateInvoicing softwareTrial balance for a closed month
Gross profitInvoiced revenue excl. VAT minus purchase cost of items soldInvoicing, cost fileGross profit for the last closed month
Weighted pipelineAmount of each open deal × probability of its stageCRMForecast from the last committee meeting

Changing a rule after it has been approved requires a change order: that is what keeps a figure from changing meaning from one month to the next.

Acceptance: a known figure, reconciled

Accepting a dashboard means reconciling its figures with figures you already know. For the SME, the October trial balance shows €412k of revenue excl. VAT; the first version of the report shows 431.

The gap tells you where to look.

Two reconciliations of October revenue (excl. VAT) with the trial balance, on the same scale. Left, wrong, in orange: the report adds up invoices issued, €431k, against €412k in the trial balance, a €19k gap, 4.6%. Right, correct, in green: invoices issued minus credit memos, by invoice date, €412k, no gap. Another common cause of gaps: counting by order date instead of invoice date.Two reconciliations of October revenue (excl. VAT) with the trial balance, on the same scale. Left, wrong, in orange: the report adds up invoices issued, €431k, against €412k in the trial balance, a €19k gap, 4.6%. Right, correct, in green: invoices issued minus credit memos, by invoice date, €412k, no gap. Another common cause of gaps: counting by order date instead of invoice date.
A €19k gap: the month’s credit memos had not been deducted.

With the dictionary rule, invoices minus credit memos, the report drops back to €412k. The other common cause of such a gap is the date: revenue counted by order date never reconciles with books kept by invoice date.

Acceptance is done lot by lot. You have ten business days to respond, five after a fix. An “OK” by email counts as acceptance; without a written reservation within that time, the lot is deemed accepted, then invoiced.

The SME’s acceptance certificate fits in two lines. The first: “Lot 1, data foundation, revenue reconciled with the trial balance for a closed month: accepted.” The second: “Lot 2, Summary, Pipeline and Sales by customer pages, published and refreshed: accepted.”

Why do dashboard projects fail?

A dashboard project rarely fails for a technical reason. Seven causes come up again and again, all visible before signing, starting with a decision that is never named, calculation rules that are never settled and access that is slow to arrive.

  1. No decision behind the project. “Having a dashboard” is not a goal. Name the meeting it serves and the decision it informs: the whole scope follows from that.
  2. Calculation rules that are never settled. Two departments, two revenue figures. A definition not validated in the first lot makes the report open to dispute from the very first meeting.
  3. Access that never arrives. A locked database, a slow vendor, an overloaded IT department: this is a very common cause of delay. Identify at the first call who can grant access to each tool.
  4. Data that doesn’t exist, or is poorly entered. A dashboard doesn’t create data. An export from each source, requested before signing, shows what is missing; the fix happens at the source.
  5. Too many pages at once. A twenty-page scope is hard to validate and even harder to read. Start with the report that matters most; the others follow in lots.
  6. Nobody to keep it alive. Without an owner on your side, a report stops being opened within a few months. Name that person before kickoff.
  7. A go-live that never happens. The project is only finished when the report is read in a meeting. From the quote stage, set the first meeting that will use it.

A common case in SMEs: three months after delivery, nobody opens the report, because there is no named meeting, there are two revenue figures and the author has left (causes 1, 2 and 6). None of these is fixed by a better chart.

Microsoft makes the same point in its BI solution planning guidance, which starts with gathering requirements: “Collecting the wrong requirements is a common reason why implementations fail.”

Should you build your dashboard yourself or have it built?

Doing it yourself suits one source and few readers, if someone has time to learn. Coaching suits a team that will keep developing its own reports. Having it built makes sense when several sources have to be combined and the figures carry weight.

Power BI Desktop is a free Windows application, and the learning paths on Microsoft Learn are well made: having your dashboard built is not always the right answer. The real question is how much time you have in-house, and what a wrong figure costs.

CriterionDo it yourselfGet coachedHave it built
Best forSomeone comfortable with Excel who has the time and wants to learnA team that wants to become self-sufficient, with an expert alongsideManagement that wants a defined result, with no in-house data analyst
What it costsThat person’s time, often several weeks, plus licensesCoaching sessions, plus the team’s timeA fixed price written into the quote, plus licenses
The main riskA fragile data model nobody else understandsA project that drags on if the team runs short of timeA scope that was poorly written at the start

Boiled down to two questions, the three routes sort themselves out quickly.

Two-question decision tree. First question: a single source, few readers? Yes: do it yourself, in Excel or Power BI Desktop. No: second question, will the team develop the reports itself? Yes: get coached. No: have it built. The example SME, with three sources and no data analyst, follows the green branch, no then no, to “have it built.”Two-question decision tree. First question: a single source, few readers? Yes: do it yourself, in Excel or Power BI Desktop. No: second question, will the team develop the reports itself? Yes: get coached. No: have it built. The example SME, with three sources and no data analyst, follows the green branch, no then no, to “have it built.”
Three sources and nobody to maintain the model: the SME is better off having it built.

For the SME, both answers are no: it is better off having it built.

Building a dashboard for free

You can design a dashboard without paying anything: Power BI Desktop is a free download, and Excel or Google’s Data Studio (formerly Looker Studio) can also be used to build one. The catch comes with sharing: in Power BI, every reader of a shared report needs a Pro license, unless you have a Fabric F64 capacity or above.

The Excel dashboard guide provides a free template, the comparison of dashboard software details the limits of each tool, and Power BI vs Data Studio puts the two side by side.

When a build is not the right solution

SituationWhat is enough, or what you need
One source, one reader, once a monthA well-kept spreadsheet.
Your software already has its own dashboardsThe built-in reporting of your accounting software or CRM may already answer the question.
The data isn’t entered anywhereStart with the data entry process.
A group-wide data platform: several countries, several teams, Microsoft FabricA team of several specialists working at the same time, not a fixed-price build.

To compare freelancers, consulting firms and IT services companies, see Power BI consultant: how to choose.

What does a successful build look like?

A successful build is easy to spot: a report that is read in meetings, refreshes itself and can be taken over by the client without its author.

Take the SME in our example. Access requested at the first call, mapping table validated in the first phase, credit memos deducted at acceptance: by the end of the third week, its report is live.

The following Monday, the sales review opens on the Pipeline page: nobody argues about the gap between two files anymore; the team decides which deals to follow up on.

Frequently asked questions

What is the best tool to build a dashboard?

The one that reads your sources without manual re-entry. Excel is enough for one source and a monthly update. Power BI becomes the better choice when several tools have to be combined and several people read the same figure. Google’s Data Studio mostly suits Google data. The choice depends on your sources, not on the charts.

Can you build an Excel dashboard instead of Power BI?

No: Datafuji only builds Power BI dashboards. If a spreadsheet is enough (one source, one reader, one update a month), Dylan will tell you on the first call. Power BI becomes useful as soon as several sources have to be combined or the file is rebuilt by hand every month.

What are the 3 types of dashboards?

The usual distinction is between the strategic dashboard, read by senior management, the management dashboard, read by department heads, and the operational dashboard, read by teams. Other classifications are covered in the dashboard guide.

Who owns the dashboard once it is built?

You do. The report is published in your own Power BI workspace, and the source code, documentation and rights are transferred to you on payment. Another provider, or someone on your team, can then take it further.

Power BI dashboard or report: what is the difference?

In Power BI, a dashboard is a single page in the online service, made of tiles pinned from one or more reports. It cannot be created in Power BI Desktop and cannot be filtered. A report has one or more filterable pages built on a single semantic model, that is, the published data model. What an SME calls its “dashboard” is almost always a report; see the Power BI dashboard guide.

Let’s talk about your reporting.

A 30-minute video call with Dylan Arnaud. You come away with a clear scope and a fixed price.

Dylan Arnaud, Power BI consultant and founder of Datafuji
Dylan ArnaudFounder · your single point of contact