What is a production dashboard?
A production dashboard is the management tool of a manufacturing site. It brings together a dozen indicators, always calculated the same way, compared with a target or with the prior year, and updated without manual re-entry.
It does not replace the ERP (enterprise resource planning), the MES (manufacturing execution system) or the CMMS (computerized maintenance management system): it reads them and connects them. An OEE loss then also shows up in euros of unit cost and in late orders.
The SME in our example is fictitious: three lines (machining, stamping, assembly), €2.84M of revenue in October. Its figures are consistent from one indicator to the next.
Three readers, three rhythms
The same data serves three readers, each at their own pace:
| Reader | What they read | Rhythm |
|---|---|---|
| Plant management and CFO | Margin by product family, unit cost variance, inventory, OTIF | Every month, after the close |
| Production: operations director, shop floor supervisors | OEE by line, downtime by cause, scrap, schedule adherence | Every day or every week |
| Maintenance | Preventive work completed, MTBF, MTTR, equipment with the most downtime | Every week and every month |
The financial side of the plant (profit, cash, working capital requirement) belongs in the financial dashboard.
Which KPIs should a manufacturer track?
Ten KPIs cover the essentials: three for the shop floor (OEE, scrap, schedule), three for maintenance (MTBF, MTTR, preventive), three for plant economics (unit cost, margin, inventory) and one for the customer (OTIF).
A single-line site can stick to five. The source shown is the most common one; yours may differ.
| KPI | Formula | Usual source | Most common pitfall |
|---|---|---|---|
| OEE (overall equipment effectiveness) | Fully productive time ÷ planned production time = availability × performance × quality | MES or PLCs; ideal cycle times in the ERP routings | Publishing an OEE calculated on opening time (a TRG) as OEE. |
| Scrap rate | Scrapped parts ÷ parts produced | MES, quality reports, ERP scrap transactions | Counting reworked parts as good. |
| Schedule adherence | Conforming quantities produced ÷ planned quantities, by work order | ERP (work orders), MES | Comparing with the latest rescheduled plan. |
| MTBF (mean time between failures) | Run time ÷ number of failures | CMMS and MES run time | Using calendar time instead of run time. |
| MTTR (mean time to restore) | Total failure downtime ÷ number of failures | CMMS (start and end of work orders) | Leaving out the wait for parts or a technician. |
| Preventive maintenance compliance | Preventive work orders completed ÷ scheduled | CMMS | Work orders closed late. |
| Unit cost | Materials + labor + machine time + allocated overhead, by item | ERP (bills of materials, routings, work orders), cost accounting | A three-year-old standard cost. |
| Margin by product | Revenue − unit cost, by item or family | ERP, accounting | Reading it without each family’s volume. |
| Days of inventory | Inventory ÷ cost of sales per day | ERP | Adding up month-end inventories. |
| OTIF (on time in full) | Lines delivered complete on the promised date ÷ lines due | ERP (orders and shipments) | Not writing down which date counts. |
Where the numbers come from
The ERP holds the routings and their cycle times, the work orders, sales, inventory and costs. The MES (shop floor execution software) records machine states, parts and downtime causes; the CMMS (computerized maintenance management system) records the equipment and the work orders.
Excel almost always holds the targets and the downtime causes entered by hand. How to pull data from each ERP (SAP, Business Central, Odoo, Divalto…) is covered in Power BI and ERP.
How do you read a line’s OEE, and why not compare it with a TRG?
OEE compares the time spent making good parts with the time the line was planned to produce. In France it is called TRS and is defined by the French standard NF E60-182. French plants also publish a TRG, which divides the same time by the opening time, so it is always lower than or equal to OEE.
Opening time minus planned stops (preventive maintenance, trials, meetings) gives planned production time; minus unplanned stops (failures, changeovers, waiting), run time. Net run time is the time that all parts produced would have taken at the ideal cycle time; fully productive time, the same for good parts only.
The SME’s stamping line in week 43: 120 h of opening time, 112 h of planned production time, 14 h of unplanned stops, a 30-second cycle, 10,400 parts produced, 10,090 of them good the first time. The time cascade shows where the hours go.
The calculation, layer by layer:
Availability = 98 h ÷ 112 h
= 87.5%
Net run time = 10,400 × 30 s
= 86.7 h
Performance = 86.7 h ÷ 98 h
= 88.4%
Quality = 10,090 ÷ 10,400
= 97.0%
Productive time = 10,090 × 30 s
= 84.1 h
OEE = 84.1 h ÷ 112 h
= 75.1%
TRG = 84.1 h ÷ 120 h
= 70.1%Of the 27.9 hours lost, unplanned stops (14 h) weigh more than slowdowns (11.3 h) and quality losses (2.6 h): that is where the line has the most to gain.
OEE, TRG, TRE and TEEP
The French TRG (taux de rendement global, OEE on opening time) divides fully productive time by opening time; the TRE (economic) divides it by total calendar time, close to what English-speaking plants call TEEP. On the same line, TRE ≤ TRG ≤ OEE. Hence the Monday meeting where one shop reports 72% OEE, the other 64%, and the second gets the blame when it is actually reporting a TRG.
The same fully productive time, divided by two different times, gives two rates.
The 5-point gap says nothing about the shop floor: it comes from the denominator. Before comparing two lines, ask which of the two rates each one publishes.
OEE (Overall Equipment Effectiveness) comes from Seiichi Nakajima’s TPM (Total Productive Maintenance); the international standard ISO 22400-2 also defines it. The 85% often presented as “world-class” OEE has no normative basis: it depends on the product, the batch sizes and the planned production time used.
Run the numbers on your own line
The OEE calculator uses these six inputs, starts from the stamping line’s values and puts a figure on the first loss to tackle; your numbers stay in your browser.
How do you track maintenance with MTBF, MTTR and preventive work?
Maintenance is managed with three figures taken from the CMMS. MTBF says how long a piece of equipment runs between two failures, MTTR how long it stays down. The third is the preventive maintenance compliance rate.
In October, the SME’s critical equipment ran 46 hours on average between failures, with 2.3 hours of downtime per failure. This gives its inherent availability, the part that maintenance controls:
Inherent availability
= MTBF ÷ (MTBF + MTTR)
= 46 ÷ (46 + 2.3)
= 95.2%
Target: 96.8%Press P3 pulls the average up: 9 failures for 24.3 hours of downtime, an MTTR of 2.7 hours. Under the European standard EN 13306 (French edition NF EN 13306), MTTR counts the whole stop, detection and waiting for parts included, not just the repair.
Preventive maintenance is slipping: 102 work orders completed out of 124, or 82% against a 95% target. The robots are furthest behind: 13 work orders out of 22 (59%), which nonetheless consumed 121% of the planned hours.
Actual hours above 100% mean that the task lists underestimate the time, or that work orders are being closed incorrectly. The European standard EN 15341 guides the choice of maintenance KPIs; the MTBF and MTTR calculator starts from your list of failures, pasted from a CMMS or Excel export.
How do you connect the shop floor to euros?
The shop floor translates into euros through four ERP KPIs: unit cost by item, margin by product family, days of inventory and OTIF. That is what plant management reads every month.
In October, the SME’s margin on standard cost is 24.6%, against a 26.0% target. The table by family shows where the gap comes from:
| Family | Revenue (€k) | Margin (€k) | Margin % | Target | Variance |
|---|---|---|---|---|---|
| Machined parts | 1,240 | 260 | 21.0% | 24.3% | −3.3 pts |
| Stamped parts | 980 | 274 | 28.0% | 28.5% | −0.5 pts |
| Subassemblies | 620 | 165 | 26.6% | 25.5% | +1.1 pts |
| Total | 2,840 | 699 | 24.6% | 26.0% | −1.4 pts |
Machined parts account for the entire gap on their own (−€41k of margin, 3.3 points on €1,240k, for a total gap of −€40k), subassemblies offset part of it, and machining is also the line with the lowest OEE in week 43 (68.9%). That is one week set against one month, with no proof that one causes the other: the dashboard is there to put the question to the right shop floor supervisor.
Inventory stands at €4.10M, €500k above the €3.60M target, including €0.62M with no movement at all in six months. Days of inventory are calculated on the month’s cost of sales (revenue minus margin: 2.84 − 0.70 = €2.14M), divided by 31 days:
Days of inventory = €4,100k
÷ (€2,140k ÷ 31 d)
= 59 days
Target: 51 daysThe 8-day gap is worth about €550k (2,140 ÷ 31 × 8), not €500k: the two targets do not use the same basis, so write down which one counts.
Finally, OTIF stands at 91.5% against a 95% target; OTD (on-time delivery) looks only at the date, not the quantities. OTIF is only meaningful if the reference date is written down: depending on the date used, requested or confirmed, and the tolerance, the gap can reach several points (OTIF calculator).
What do a plant’s dashboards look like?
A plant reads three reports built on the same data: site management, production and maintenance. Each fits on two pages and answers one question per page.
The summary page of the site management report fits on one screen.


| Report | Pages and question | Headline KPIs (example SME) | Sources | Refresh |
|---|---|---|---|---|
| Site management | Is the site hitting its targets this month? Where is inventory above target? | Revenue €2.84M; margin 24.6%; OTIF 91.5%; inventory €4.10M; 59 days of inventory | ERP, cost accounting, Excel targets | Every night; final after the close |
| Production | Is the site hitting its OEE target? Where are we losing hours to downtime? | OEE 71.8%; availability 86.2%; performance 87.0%; 46 h of downtime; scrap 3.1% | MES or shop floor entries, ERP (schedule and routings) | Several times a day or every night |
| Maintenance | Is critical equipment failing less often? Where is preventive maintenance slipping? | MTBF 46 h; MTTR 2.3 h; preventive 82%; corrective 38% of hours | CMMS, MES run time | Every night |
The “downtime” page of the production report triggers the most action; a Pareto chart of causes (sorted from largest to smallest) is enough to read it.
The top two causes account for 24 of the 46 hours, or 52%; changeovers can be shortened with the SMED method (single-minute exchange of die, a changeover in under ten minutes). A second Pareto, by number of stops, tells you whether a cause matters because of a few long failures or many short stops. Other functions have their own typical report in the Power BI dashboard guide.
Which mistakes skew manufacturing KPIs?
Plant KPIs are skewed mostly by definitions that vary from one site to another, averages of percentages, incomplete machine data and equipment that does not carry the same code everywhere.
An OEE that does not mean the same thing from one site to another
At 64% against 72%, the second site is not necessarily worse. Beyond OEE versus TRG, four choices move the figure:
- The ideal cycle time. With the cycle time from the quote, slower than the machine builder’s, performance is artificially inflated.
- Changeovers. Planned stops at one site, they fall outside planned production time; unplanned at the other, they weigh on availability.
- Minor stops. Recorded as stops here, elsewhere they end up in the performance gap: OEE does not change, the cause shown does.
- Rework. Counted as good, it inflates quality. Count only parts that are good the first time: at the SME’s site, scrap is 3.1%, but OEE quality is 95.7%, rework excluded.
The remedy: a written definition, the same everywhere, applied in the data model.
Averaging OEE
A site’s OEE is not the average of its lines’ OEE. Line A, planned for 100 hours at 80%, and line B, planned for 20 hours at 50%, give 65% as a simple average. Instead, add up the fully productive times and the planned production times, then divide:
Site OEE = (80 h + 10 h)
÷ (100 h + 20 h)
= 75% (not 65%)The same rule applies to the days of the week, MTBF, MTTR and the scrap rate. Inventory, on the other hand, does not add up over time: the quarter’s inventory is the one at the end of the period.
Incomplete machine data
A PLC’s part counter is reliable; the cause of a stop is often entered by hand, after the fact, or not at all. Show the share of “cause not entered” and track it as an indicator, instead of filing it under “Other.”
The other classic gap is a piece of equipment that goes by a different name in each system.
Without this table, there is no way to tell how much the press costs in OEE. Other frequent gaps: clocks out of sync, stops straddling two shifts, work orders closed late that skew MTTR.
Which public benchmarks can a manufacturing SME compare itself with?
For French industry, the Banque de France (the French central bank), INSEE (the French national statistics office) and the Assurance Maladie (French national health insurance, which covers workplace accidents) publish benchmarks: payment terms, inventory levels, profit share, hourly labor cost, accident rates. No public statistic gives a reference OEE.
Collected on November 20, 2026, these French figures help situate a company without setting it a target; check the scope of each one, manufacturing or industry in the broad sense:
| Indicator | Benchmark for industry | Year and scope | Source |
|---|---|---|---|
| Customer payment terms (DSO) | Manufacturing: 43.9 days of revenue on average; 41.5 across all sectors | 2025, excluding micro-enterprises, on a 360-day basis | Banque de France |
| Supplier payment terms (DPO) | 50.9 days of purchases | 2025, same scope | Banque de France |
| Net trade credit (receivables minus payables) | 12.2 days of revenue | 2025, same scope | Banque de France |
| Inventory level | Median 43.1 days of revenue excl. VAT; a quarter below 18.3, a quarter above 81.3 | 2024, companies with revenue above €1.25M, on a 360-day basis | Banque de France, sector report |
| Profit share (gross operating surplus ÷ value added) | Median 22.2% | 2024, same scope | Banque de France, sector report |
| Value added rate | 23.9% in industry (excluding construction) | 2023, non-farm, non-financial market sectors | INSEE |
| Hourly labor cost | €47.70 in industry (excluding construction), €44.70 across all market sectors (B to N) | 2025, companies with 10 or more employees | INSEE and Eurostat |
| Capacity utilization rate | 82%, against an average of 83% since 1976 | July 2026, business survey | INSEE |
| Workplace accidents | Frequency index of 24.5 per 1,000 employees (25.2 in 2023) | 2024, general social security scheme | Assurance Maladie |
Four precautions before using them:
- Redo the calculation with the source’s formula. The Banque de France calculates on 360 days and divides inventory by revenue excl. VAT, not by cost of sales.
- An average is not a median. The 43.9-day customer payment term is an average; the sector report’s median, 49.8 days, covers a different population.
- Drill down to your NAF code (INSEE’s French activity code, comparable to a NAICS code) when it exists: for accidents, industrial machining (2562B) has a frequency index of 29.4 per 1,000 employees. This French index counts accidents per 1,000 employees, not per hours worked like the LTIFR or the US OSHA rates (LTIFR calculator); the sector reports also break down by division (financial ratios).
- For OEE, OTIF, MTBF or scrap, the benchmark is your own history, line by line.
The first precaution changes everything for the SME’s inventory.
The Banque de France calculation assumes annual revenue of 2.84 × 12 = €34.1M, a simplification. That does not make the SME “average”: it is managed against its own 51-day target.
How do you set up a production dashboard?
A production dashboard is set up in five steps. You write the definition of each KPI and list its source. Then you share one list of equipment, build the pages by reader, and reconcile the figures over past weeks.
- Write each definition, starting with what OEE’s planned production time includes and which date counts for OTIF.
- List the source of each figure: MES, ERP, CMMS or Excel, with the person who maintains it.
- Share one equipment list between the MES and the CMMS: the mapping table for press P3.
- Build the pages by reader: plant management, production, maintenance.
- Reconcile the figures over a few past weeks before retiring the old tracking.
Do you need Power BI, or is your MES enough?
Power BI is for bringing several sources together to analyze by shift, by day, by site. If a single tool already sees everything you manage, its reports are often enough.
| Your situation | The simplest option | Why |
|---|---|---|
| An MES in place covers OEE, downtime and scrap | The MES dashboards | They are wired as close to the machines as possible. |
| A real-time shop floor screen, machine by machine | The MES or OEE tracking software | Power BI is for analysis, not second-by-second display. |
| No machine data: everything is on paper | Capture the data first | Tablets, counting devices or an MES: a dashboard does not create data. |
| Only maintenance reads its indicators | The CMMS reports | Check first what it can do on its own. |
| One line, one supervisor, one sheet kept every day | A spreadsheet | It is enough as long as it does not circulate in several versions. |
| ERP, MES, CMMS and Excel targets on the same page | Power BI | It links an OEE loss to its cost and its delays. |
| Several sites to compare | Power BI | One OEE definition for all, permissions by reader. |
For maintenance, the CMMS already contains the essentials. What remains is to write down when a work order counts as done, group the machines by line, and keep queries the team can read.
What a production dashboard costs
Two cost items: the design, paid once, and the licenses. A production report on its own (MES and a targets file) costs €3,000 excl. VAT as a fixed-price package. The three reports together (six pages, ERP, MES, CMMS and Excel) cost €5,000 excl. VAT (package details).
To share a report, the author and every reader need a Power BI Pro license, at €12.10 excl. VAT per user per month (annual billing, French list price). For eight users:
Licenses = 8 users
× €12.10 × 12 months
= €1,161.60/year excl. VAT,
at French list pricesThe lead time, 2 to 4 weeks, depends mainly on your read access and your definitions.
In the end, the Monday meeting no longer compares an OEE with a TRG. It sees that mechanical failures lead in week 43, that press P3 racked up 24.3 hours of failures in October, and decides who brings its preventive maintenance forward, and when.
Frequently asked questions
What is manufacturing performance?
It is a plant’s ability to deliver what was ordered, on the promised date, at the expected quality and cost. It is measured on four fronts: equipment effectiveness (OEE), quality (scrap), service (OTIF) and cost. Any one of them alone is misleading: an OEE inflated by long production runs drives inventory up.
What are the main production KPIs?
OEE and its three components (availability, performance, quality), scrap rate, schedule adherence, MTBF and MTTR. On the plant economics side, add unit cost, margin, inventory and OTIF. A single line can start with OEE, scrap and downtime by cause.
What are the 3 types of KPIs?
A common classification separates outcome indicators (OEE, margin, OTIF), activity or process indicators (preventive maintenance completed, schedule met) and alert indicators (scrap above a threshold, inventory beyond its target days of cover). A plant dashboard mixes all three.
What are the quality KPIs in production?
Scrap rate divides scrapped parts by parts produced; first-pass yield is the share of parts that conform without rework. Add defects in PPM (nonconforming parts per million) and the cost of poor quality, in euros. On the customer side, add the complaint rate.
Can you build a production dashboard in Excel?
Yes, as long as there are one or two sources and a weekly update: an entry sheet per shift, a targets table, and formulas that add up times before dividing. Excel reaches its limit when you need to combine MES, CMMS and ERP data every day, or compare several plants.
