What is a logistics dashboard?
A logistics dashboard is the tool for managing the supply chain. It follows a flow, not a department: from purchasing to inventory, picking and transport, with maintenance underpinning the last two links.
Without one, a familiar scene plays out at the Monday meeting. Sales reports a 96.8% fill rate, the warehouse 95.7% of lines on time, transport 93.7% of deliveries within the delivery window. The same day, a customer complains about late or incomplete orders. Everyone is right; nobody tracks the order line from end to end.
Each system sees one piece of the flow. The ERP (enterprise resource planning software) knows the orders and purchases, the WMS (warehouse management system) the warehouse, the TMS (transportation management system) the routes, the CMMS (computerized maintenance management system) the work orders, and onboard telematics the distance driven. The dashboard brings them together so that a late order can be traced to its cause: a supplier, a stockout, a missed departure, a vehicle off the road.
The SME in our example is fictitious: a regional distributor in France, two warehouses, 24 vehicles, 13,840 lines to deliver in October, with part of its deliveries outsourced to three carriers. Its figures run through the whole article.
Mapped onto its five systems, an order’s journey shows why none of them is enough on its own.
Neither the TMS nor the WMS can explain the late line: its cause arose three links earlier, at a supplier.
The same dashboard has three readers, who read the same data at the three classic levels of management (strategic, tactical and operational):
- the logistics or supply chain director, at the strategic level, every month: customer service, inventory, suppliers and costs;
- the transport manager, at the tactical level, every week: cost per kilometer and per delivery, load factor, on-time performance by carrier;
- the maintenance manager, at the operational level, every week for preventive maintenance, every month for breakdowns and fleet availability.
Factory production (OEE, scrap, production plan) and production machine maintenance have their own guide: the production dashboard. The financial side (profit, cash, working capital requirement) has one too: the financial dashboard.
Which KPIs should you track in transport and logistics?
Twelve KPIs cover the flow: customer service (OTIF, fill rate), inventory (stockouts, days of cover, accuracy), the warehouse (productivity), costs and transport, inbound (suppliers) and maintenance. To get started, five are enough: OTIF (01), stockout rate (03), days of inventory (04), logistics cost per order (07) and supplier OTIF (10).
| KPI (frequency) | Formula | Usual source | Most common pitfall |
|---|---|---|---|
| 01 OTIF, on time in full (weekly) | Lines delivered on the promised date and in full ÷ lines due | ERP + WMS + TMS or proofs of delivery | Multiplying the on-time rate by the in-full rate. |
| 02 Fill rate (weekly) | Quantities delivered ÷ quantities ordered, regardless of date | ERP + WMS | Mistaking it for OTIF: it ignores delays. |
| 03 Stockout rate (daily) | Active SKUs with zero stock ÷ active SKUs, at a given date | WMS or ERP | Leaving inactive SKUs in the denominator, which dilutes the rate. |
| 04 Days of inventory and inventory turnover (monthly) | Days of inventory = inventory ÷ average daily usage; turnover = cost of goods sold over 12 months ÷ average inventory | ERP or WMS | Adding up month-end inventories. |
| 05 Inventory accuracy (monthly) | Locations with no variance at cycle count ÷ locations counted | WMS | Counting variances in net value: a shortage and a surplus cancel each other out. |
| 06 Picking productivity (daily) | Lines picked ÷ picking hours clocked, by shift and by zone | WMS + time clock | Dividing by scheduled hours, not clocked hours. |
| 07 Logistics cost per order (monthly) | (Warehouse costs + transport costs) ÷ orders delivered | Cost accounting + ERP | Forgetting carrier invoices received after the month-end close. |
| 08 Transport cost per km (monthly) | Fleet costs (drivers, fuel, maintenance, tolls, lease or depreciation, insurance) ÷ km driven | Accounting + telematics + fuel cards | Dividing by the planned kilometers in the TMS. |
| 09 Load factor (weekly) | Pallets, m³ or kg loaded ÷ vehicle capacity | TMS or load plans | Averaging route-by-route rates: a half-empty shuttle counts as much as a full semi. |
| 10 Supplier OTIF and lead time (monthly) | Lines received on the confirmed date and in full ÷ lines expected; lead time = receipt − order | ERP (purchasing, receipts) | Measuring against the latest rescheduled date. |
| 11 Preventive maintenance compliance (weekly) | Preventive work orders completed ÷ scheduled, by plan; actual hours ÷ planned | CMMS | Counting a work order closed three weeks late as done. |
| 12 MTBF, MTTR, availability (monthly, rolling 12 months) | MTBF (mean time between failures) = operating time ÷ failures (in km for a vehicle); MTTR (mean time to restoration) = downtime ÷ breakdowns; availability = vehicles available ÷ fleet | CMMS + telematics | Leaving the wait for parts out of MTTR. |
A warehouse without its own fleet can skip 08 and 12. The free calculators for fill rate and OTIF, inventory turnover, and MTBF and MTTR apply the same formulas.
Where the numbers come from
The ERP holds the orders, promised dates, receipts and inventory value. The WMS holds the locations, picks and cycle counts; the TMS, the routes, loads and often the proofs of delivery.
The CMMS holds the equipment, preventive plans and hours; telematics, mileage and fuel consumption.
Excel almost always holds the rest: targets, schedules, carrier invoices to reconcile, and the mapping table between a vehicle in the TMS and its equipment record in the CMMS. Depending on the system, Power BI reads the database, goes through a cloud application’s API, or reads a nightly export; the Power BI and ERP guide details the connectors.
In the Power BI data model, inventory is a snapshot taken at a point in time; an order is tracked step by step: ordered, picked, shipped, delivered. Data modeling experts Ralph Kimball and Margy Ross call these a periodic snapshot and an accumulating snapshot, respectively.
Purchasing and procurement KPIs
Purchasing is the first link: a late supplier becomes a stockout, then an incomplete customer order. Four indicators, all from the ERP, are enough to start:
- supplier OTIF, by supplier;
- actual lead time against the lead time set in the ERP: a persistent gap distorts every replenishment calculation;
- spend by supplier and by category, and the share going to the top three;
- purchase price trend by item, at comparable quantities, against the prior year.
How do you calculate OTIF, and why can’t you derive it from the on-time rate?
OTIF (On Time In Full) counts the lines delivered on the promised date and in full, divided by the lines due, checking both conditions on each line. Multiplying the on-time rate by the in-full rate gives a false figure.
In October, the SME has 13,840 lines to deliver. Of these, 596 arrive late, 712 arrive incomplete, and 118 are both: those 118 lines must be subtracted only once.
Missed OTIF = late + incomplete
− both at once
= 596 + 712 − 118
= 1,190
OTIF = (13,840 − 1,190) ÷ 13,840
= 12,650 ÷ 13,840
= 91.4%The target is 95%; a year earlier, the SME was at 89.8%.
The on-time rate alone, OTD (On Time Delivery), is 13,244 ÷ 13,840 = 95.7%; the in-full rate, 13,128 ÷ 13,840 = 94.9%. OTIF is always less than or equal to OTD: a high OTD with a low OTIF points to completeness, and therefore to stockouts and picking, not to transport.
The common shortcut is to multiply the on-time rate by the in-full rate.
Multiplying assumes delays and shortages occur at random: it expects only about 31 lines hit by both (596 × 712 ÷ 13,840), whereas there are 118. Those 87 extra lines account for the 0.6-point gap, which widens when delays and shortages share a cause, such as an order picked late that ships incomplete.
The fill rate in units, 398,800 units delivered out of 412,000 ordered, reaches 96.8%: it ignores delays and counts units, not lines. It is the figure Sales quoted at the Monday meeting, and it will almost always be the most flattering.
There is no standard definition of OTIF: each company, and often each customer, has its own. Three rules must be written down before any calculation:
- The reference date: requested by the customer or confirmed by you.
- The tolerance: the same day, or plus or minus one day.
- The unit: the line or the order. A ten-line order with one line missing misses OTIF at order level, but scores 90% at line level.
Where the 1,190 lines are lost
The dashboard assigns each line that missed OTIF to its main cause. The SME’s causes tell a different story from the usual complaint about transport.
Carrier delays account for 412 lines, or 34.6%. The other 778 originate in the warehouse: stockouts, incomplete picks, missed departures. The SME’s first lever is therefore completeness, and that leads to inventory and suppliers.
How do you track transport costs?
Transport costs are tracked per kilometer (per mile in the US) for the company’s own fleet and per delivery to compare the fleet with outsourced transport (deliveries handed to outside carriers). They are always read alongside on-time performance: a low cost achieved by delivering late is not a saving.
In October, the SME’s own fleet cost €151,800 for 81,600 km driven:
| Cost item | Amount | Per km |
|---|---|---|
| Drivers | €76,700 | €0.94 |
| Fuel | €36,700 | €0.45 |
| Lease, insurance | €21,200 | €0.26 |
| Maintenance and tires | €13,100 | €0.16 |
| Tolls | €4,100 | €0.05 |
| Total | €151,800 | €1.86 |
The target is €1.80 per km; the cost has been rising since May, and the breakdown by item shows which one is drifting. The pitfall: dividing by the TMS kilometers, which are often planned distances, instead of the actual kilometers recorded by telematics. A detour adds kilometers the plan never sees.
Own fleet or outsourced carriers: price is not enough
Combining its own fleet and outsourced carriers, the SME spent €190,000 on 4,260 deliveries, or €44.60 per delivery. By carrier, price and on-time performance do not tell the same story.
Carrier C costs €5.50 less per delivery than the company’s own fleet, but it delivers on time less than two times out of three. The 840 outsourced deliveries are only 87.5% on time, against 95.2% for the fleet: in the dashboard, price and on-time performance appear side by side, never price alone.
Load factor completes the picture: 78% of available pallet capacity used, against an 85% target. It is calculated by adding up the pallets loaded and the capacity across all routes, then dividing the first total by the second.
Claims are tracked separately: 0.6% of deliveries in October, against a 0.4% target.
How do you manage inventory and suppliers?
Inventory is managed in days of usage against a target, and tied to the suppliers who drive it up or down. A stockout often comes from a late supplier, overstock from a lead time set too long.
At the end of October, the SME holds €2.10M of inventory, or 34 days of usage against a target of 30. One day of usage is therefore worth €2.10M ÷ 34 ≈ €61.8k: the 4 extra days tie up about €247k.
If the end-of-October inventory is representative of the year, turnover is close to 365 ÷ 34 ≈ 10.7 times a year. Yet the inventory is both too high and incomplete: 1.9% of active SKUs are out of stock, against a 1% target.
Inventory adds up across items or across warehouses, never across dates: the quarter’s inventory is not the sum of three month-ends. Alberto Ferrari and Marco Russo (SQLBI) call these semi-additive measures; before writing any formula, decide whether a period’s inventory is the balance on the last calendar day or at the last count.
Supplier OTIF, done right and done wrong
Four suppliers deliver to the SME. Their overall OTIF is 84.4%; the average of their four rates gives 79.9%.
| Supplier | Lines received | OTIF | Average lead time |
|---|---|---|---|
| A | 1,240 | 91.2% | 4.1 days |
| B | 860 | 87.6% | 6.3 days |
| C | 520 | 72.5% | 11.8 days |
| D | 310 | 68.1% | 9.4 days |
The chart shows what the simple average distorts.
Here, the simple average makes things look worse than they are: it gives supplier D’s 310 lines the same weight as supplier A’s 1,240. The real problem lies elsewhere: C and D, below 75%, also have the longest lead times, and that is where some of the 356 lines lost to stockouts originate.
Which maintenance KPIs for a fleet?
For a vehicle fleet or infrastructure, six KPIs are enough: preventive work completed against scheduled, actual hours against planned, the share of corrective maintenance, MTBF, MTTR and fleet availability.
In October, the SME shows three warning signs, against a target of 95% of preventive work completed:
Preventive completed
= 174 ÷ 200 work orders = 87%
Actual ÷ planned hours
= 744 ÷ 664 hours = 112%
Share of corrective
= 456 ÷ 1,200 hours = 38%The backlog is concentrated: 26 work orders running 9 days late on average, spread over 6 of the 24 preventive plans, mostly those for the warehouse conveyors and docks.
When actual hours exceed 100% of planned, either the job plans (the planned duration of each task) underestimate the work, or preventive maintenance is done too late, on equipment that has already degraded. When preventive work falls behind, corrective work rises a few months later: two readings of the same problem.
The definitions come from the European standard EN 13306 (French edition NF EN 13306), and the choice of indicators follows EN 15341+A1. In these standards, MTTR is a time to restoration, from failure to return to service: it includes waiting for parts or a technician. The SME’s MTTR, 5.2 hours against a target of 4, includes that wait.
For vehicles, MTBF is counted in kilometers between failures (MKBF, or MMBF in miles): 18,500 km for straight trucks (rigid trucks of 3.5 to 19 metric tons), against a target of 22,000. A vehicle covers about 3,400 km a month: the whole fleet only has about four or five breakdowns a month, and the figure swings from month to month. A rolling 12-month window makes it readable.
Fleet availability, 94.6%, represents about 22.7 roadworthy vehicles out of 24.
One last pitfall often blocks everything else: the vehicle with two names, a license plate in the TMS and a unit number in the CMMS. Without a mapping table, costs and breakdowns cannot be linked.
For any fleet, the CMMS already contains the indicators. The work consists of writing down what “completed” means (a closed work order? within the scheduled week?), grouping equipment the way the team thinks about it, and keeping queries simple enough for the team to take over on its own.
That is how we work as a fixed-price Power BI consultancy.
How do you benchmark against other companies in your sector?
Two public French benchmarks are useful: payment times by sector from the Banque de France (the French central bank) and the cost structure published by the Comité national routier (CNR, the French road freight transport cost observatory). For OTIF, fill rate or load factor, no French public statistics exist.
Payment times
In 2025, French transportation and storage companies were paid in 50.2 days of revenue on average, against 41.5 days for the economy as a whole. The source is the Banque de France, which calculates on a 360-day basis, excluding micro-enterprises.
Compared with other sectors, transport sits well above the average.
The sector pays its suppliers in 40.5 days of purchases; its trade balance (customer receivables minus supplier payables, expressed in days of revenue), 26.4 days, is more than double the average (12.0). A carrier therefore finances part of its customers’ business. About one company in four in the sector (26%) waits more than 60 days to be paid.
A distribution SME like the one in our example should benchmark against trade (24.0 days), not transport; a carrier or logistics provider, against transportation and storage.
The average says nothing about the legal rule: in France, for road freight transport, vehicle rental and freight forwarding, an invoice must be paid within 30 days at most. Since the Banque de France only counts a payment as late beyond 60 days, it considers late payment in the sector potentially underestimated.
The DSO calculator gives the breakdown by sector and redoes the calculation on a 360-day basis.
The cost structure of road freight
Every year, the CNR publishes the cost structure of for-hire road freight transport in France. In 2024, the full cost of regional transport by straight truck (3.5 to 19 metric tons) rose by 2.4%, and by 5.3% excluding fuel, driven by driver costs.
| Cost item, share of total cost in 2024 | Regional, straight truck | Long haul, tractor-trailer |
|---|---|---|
| Drivers | 41.4% | 29.1% |
| Vehicle ownership | 20.6% | Just over 12% |
| Commercial diesel | 16.9% | 22.1% |
| Maintenance and repairs | 7.5% | About 8.3% |
| Overhead | Not published | 13.7% |
For road freight as a whole, the CNR puts overhead at around 13% of total cost.
Before comparing, align the scope. The SME’s €151,800 of fleet costs include neither overhead nor facilities: drivers account for 50.5% of them, a share that would fall once those costs were added. The benchmark is there to check an order of magnitude, item by item, not to set a target.
Power BI, or your WMS and TMS reporting?
Power BI is for bringing several sources together (ERP, WMS, TMS or CMMS) and keeping them up to date. When a single source answers the question, the reporting built into the WMS or TMS is often simpler.
| Your situation | The simplest option | Why |
|---|---|---|
| Warehouse activity only | The WMS dashboards | All the data is in the WMS. |
| Routes and on-time performance only | The TMS reporting | One source, with screens designed for it. |
| Tracking trucks in real time | The telematics platform | Power BI is for analyzing and deciding, not for following a position minute by minute. |
| Promised dates are not recorded | Neither, at first | No promised date, no OTIF: fix data entry. |
| OTIF must link ERP, WMS and TMS | Power BI | None of the three sees the order end to end. |
| Costs, breakdowns and kilometers to reconcile | Power BI | Accounting, CMMS and telematics share neither data nor vehicle IDs. |
When Power BI is the answer, the path takes four steps. Write the definition of each KPI (date, tolerance, unit, scope), build the vehicle mapping table, connect the sources read-only, then build one page per reader. The Power BI dashboard guide covers other business functions, and the KPI guide shows the definition sheet that documents each indicator.
We always start with the definitions: automating an OTIF that everyone calculates their own way just produces three disputed numbers faster. At the end of the road, the Monday meeting reads a single OTIF, 91.4%, with its causes: it no longer debates the number, it decides which supplier to chase.
Frequently asked questions
What are the main logistics software tools?
The five most common systems are the ERP (orders, purchasing, inventory value), the WMS (warehouse management), the TMS (transportation management), the CMMS (maintenance management) and onboard telematics. Excel is usually added for targets and schedules, and a BI tool like Power BI to bring them together.
What are the 4 types of logistics?
A common split distinguishes inbound logistics (supply from vendors), internal logistics (storage and picking), outbound logistics (distribution to customers) and reverse logistics (returns, packaging, recycling). A three-way split (procurement, production and distribution) folds internal and reverse logistics into the other types. No standard imposes either one; they mainly help sort KPIs by link in the chain.
Can you build a logistics dashboard in Excel?
Yes, as long as one person maintains it, from one or two exports, once a month. The limits show up when WMS and TMS exports have to be stitched together every week, files circulate in several versions, and an added column breaks the formulas.
How much does a logistics dashboard in Power BI cost?
There is a one-time build cost, plus monthly licenses. At Datafuji, the build is a fixed-price package of €3,000, €5,000 or €8,000 excl. VAT depending on the number of pages and sources, delivered in 2 to 4 weeks. To share a report, the author and each reader need a Power BI Pro license, at €12.10 excl. VAT per user per month with annual billing (French list price, checked on November 4, 2026).
