Calculate your hourly cost rate, selling rate and day rate
The calculator gives the cost of an hour sold, its price and the day rate, and nothing leaves your browser. Enter salary, charges, days off, utilization, overhead and markup: it is prefilled with the example of a design engineer paid €3,500 gross a month.
The defaults follow French rules (35-hour week, 25 days of paid vacation, French employer charges). Every field can be changed, so the same method works with your own calendar and charge rate.
Of 1,820 hours paid, 1,155 are sold, or 63.5%. Each hour sold therefore carries €70.00 of cost: 2.17 times the loaded hourly cost (€32.31 per hour paid). With a 20% markup, the hourly selling rate is €84.00 excl. VAT and the day rate €588 excl. VAT.
At your current rate of €75.00, profit is €5,775 per person per year, or 6.7% of revenue. It falls to zero at 70.0% utilization: a margin of safety of 5 points. Each utilization point gained or lost represents 15.4 hours and €1,155 of profit per year.
| Step | Hours | Days |
|---|---|---|
| Hours paid | 1,820 | 260 |
| − Paid vacation | 175 | 25 |
| − Public holidays off | 56 | 8 |
| − Extra days off (RTT) | 0 | 0 |
| − Training | 21 | 3 |
| − Sick leave and other absences | 28 | 4 |
| Hours worked | 1,540 | 220 |
| − Hours not sold (25.0% of worked time) | 385 | 55 |
| Hours sold | 1,155 | 165 |
| Item | Per year | Per hour sold |
|---|---|---|
| Gross salary | €42,000 | €36.36 |
| Employer charges (40%) | €16,800 | €14.55 |
| Employment cost | €58,800 | €50.91 |
| Overhead | €22,050 | €19.09 |
| Full cost | €80,850 | €70.00 |
| Target markup (20% of cost) | €16,170 | €14.00 |
| Revenue to bill | €97,020 | €84.00 |
| Utilization rate | Cost of an hour sold | Profit per year |
|---|---|---|
| 60.0% | €87.50 | −€11,550 |
| 65.0% | €80.77 | −€5,775 |
| 70.0% | €75.00 | €0 |
| 75.0% (entered) | €70.00 | €5,775 |
| 80.0% | €65.63 | €11,550 |
| 85.0% | €61.76 | €17,325 |
The 12 billable people each carry €22,050 of overhead. To cover €945,000 of costs with a 20% markup, the team must bill €1,134,000 excl. VAT per year: 13,783 hours at €82.28 on average. One utilization point gained across all profiles brings in €15,556 per year, at no extra cost.
| Profile | Hourly rate | Day rate |
|---|---|---|
| Draftsperson5 people · cost €56.08 per hour · 1,232 h sold and €82,908 billed per person | €67.30 | €471 |
| Design engineer5 people · cost €70.00 per hour · 1,155 h sold and €97,020 billed per person | €84.00 | €588 |
| Project manager2 people · cost €105.68 per hour · 924 h sold and €117,180 billed per person | €126.82 | €888 |
| Team, average weighted by hours sold | €82.28 | €576 |
What is the hourly cost rate?
The hourly cost rate tells you what one billed hour costs: it divides loaded salary and overhead by the hours that end up on an invoice, not by the hours paid. Not an hour at work: an hour sold.
Hourly cost rate
= (gross salary
+ employer charges
+ overhead)
÷ hours sold in the yearA typical scenario: the owner of an engineering firm prices a project from the engineer’s loaded salary, €32 an hour, plus 30%: €42. The order book is full; at year-end, the firm posts a loss. The price left out the hours paid but never sold, and the overhead.
Three figures have similar names but mean very different things. For the engineer in the example, paid €3,500 gross a month:
- The loaded hourly cost: gross salary and employer charges, divided by hours paid. €58,800 ÷ 1,820 h = €32.31. This is what a salary calculator gives you.
- The hourly cost rate: all costs, overhead included, divided by hours sold. €80,850 ÷ 1,155 h = €70. Sell below it and every hour loses money.
- The hourly selling rate: the cost rate plus the markup. €70 × 1.20 = €84 excl. VAT, or a day rate of €588 for 7-hour days.
One bar shows what goes into the price of an hour.
Gross salary is only about 44% of the price; the rest covers employer charges, overhead, margin and, above all, the hours nobody buys.
This calculation applies to any business that sells time: engineering firms, IT services, consulting, agencies, trades. For a manufactured product, see the cost price calculator.
What are the formulas, from gross salary to day rate?
The calculation takes seven steps, from employment cost to day rate via the hours actually sold and the markup, followed by three management metrics. Each line can be checked against the design engineer example.
| Metric | Formula | In the example |
|---|---|---|
| Annual employment cost | Gross salary × (1 + employer charge rate) | 42,000 × 1.40 = €58,800 |
| Loaded hourly cost | Employment cost ÷ hours paid | 58,800 ÷ 1,820 = €32.31 |
| Days worked | Hours paid ÷ hours per day − days off | 260 − 40 = 220 days, or 1,540 hours |
| Hours sold | Hours worked × utilization rate | 1,540 × 75% = 1,155 hours (165 days) |
| Hourly cost rate | (Employment cost + overhead) ÷ hours sold | (58,800 + 22,050) ÷ 1,155 = €70 |
| Hourly selling rate | Hourly cost rate × (1 + target markup) | 70 × 1.20 = €84 excl. VAT |
| Day rate | Hourly selling rate × hours per day | 84 × 7 = €588 excl. VAT |
| Revenue per person | Hourly selling rate × hours sold | 84 × 1,155 = €97,020 |
| Value of one utilization point | Hours worked ÷ 100 × billed hourly rate | 15.4 h × 75 (price billed today) = €1,155 a year |
| Break-even utilization | Full cost ÷ (billed hourly rate × hours worked) | 80,850 ÷ (75 × 1,540) = 70% |
The markup is expressed as a percentage of cost, as in the cost price calculator: a 20% markup on cost is a 16.7% margin on price, €14 out of €84. The margin calculator explains the difference between markup and gross margin, which is measured on price.
Overhead covers the costs the business cannot tie to a project: rent, software, vehicles, insurance, and the loaded salaries of those who do not bill. The calculator spreads them per billable head; other ways of allocating them (allocation keys) are compared in the cost price guide.
How to calculate an hourly rate: a worked example
A fictitious engineering firm with 12 billable people carries €264,600 of overhead a year, or €22,050 per head. Its design engineer, paid €3,500 gross a month, costs €70 per hour sold.
The €264,600 covers premises, software, vehicles, insurance, and the salaries of the owner and the assistant. The engineer works 220 days (260 paid, minus 25 vacation days, 8 public holidays, 3 training days and 4 days of absence). His timesheets show 75% utilization, so 1,155 hours sold out of 1,820 paid.
His cost rate is therefore 2.17 times his loaded hourly cost. At €84, he bills €97,020 a year and leaves €16,170 of profit.
But today the firm bills €75 an hour. The engineer then brings in €86,625 and leaves €5,775, 6.7% of revenue. Break-even is at 70% utilization: a five-point margin of safety, worth €1,155 a point. This is a break-even point expressed in hours. Ten days without billable work, 70 hours, cost €5,250: almost all of the profit.
The trap: pricing from loaded salary alone
The most common calculation stops at the loaded hourly cost: €32.31, plus a 30% “margin,” or €42 an hour. That is the quote in the typical scenario. Over the same year and for the same engineer:
| Over one year | Price based on loaded salary | Price based on hours sold |
|---|---|---|
| Cost used per hour | €32.31 | €70.00 |
| Hourly selling rate | €42.00 | €84.00 |
| Revenue (1,155 h sold) | €48,510 | €97,020 |
| Full cost for the year | €80,850 | €80,850 |
| Profit (loss) | −€32,340 | +€16,170 |
Set against the full cost, the two prices tell the story at a glance.
At €42, revenue does not even cover the €58,800 loaded salary; breaking even would take 1,925 hours sold, more than the 1,820 paid. Two omissions explain it:
- Hours paid but not sold. The same loaded salary, divided by 1,155 hours instead of 1,820, is €50.91, not €32.31.
- Overhead. €22,050 ÷ 1,155 hours adds €19.09 to every hour sold: 50.91 + 19.09 = €70.
Enter 42 in the calculator’s “Hourly rate billed today” field and you will find these figures.
The same method for the whole team
The calculator’s team mode models the whole engineering firm with three profiles:
- 5 draftspeople paid €2,800 gross a month, at 80% utilization;
- 5 design engineers paid €3,500, at 75% utilization;
- 2 project managers paid €4,500, billing 60% of their time, because they supervise and price the jobs.
| Profile | Cost rate | Selling rate | Day rate |
|---|---|---|---|
| Draftsperson (5) | €56.08 | €67.30 | €471 |
| Design engineer (5) | €70.00 | €84.00 | €588 |
| Project manager (2) | €105.68 | €126.82 | €888 |
The team costs €945,000 a year and must bill €1,134,000 for a 20% markup on cost.
The project manager shows the effect of unsold time: a salary 29% higher than the engineer’s, but a cost rate 51% higher. Overhead is split equally among the twelve.
These rates are then used to cost the hours spent on each job: the project dashboard uses them to derive the actual cost and the forecast margin at completion of a project portfolio, with the same €70 rate.
How many hours are really billable in a year?
An employee on a French 35-hour week is paid for 1,820 hours a year and works about 1,540 of them once vacation, public holidays, training and absences are taken out. At 75% utilization, 1,155 are sold: 63.5% of hours paid.
Between the pay stub and the invoice, time drops through three levels:
- Hours paid: 35 × 52 = 1,820 hours a year, 151.67 a month.
- Hours worked: hours paid, minus vacation, public holidays off, extra days off (RTT in France), training and absences. 1,540 hours in the example.
- Hours sold: the ones that end up on an invoice. Nobody pays for the rest: meetings, quotes, rework, downtime between projects.
The waterfall shows where the hours go.
The last level, 385 hours, is larger than vacation and public holidays combined, and it is the one people forget.
Utilization, the main cost lever
The utilization rate, or billable utilization, is billed hours ÷ hours worked. It is also written as billable hours ÷ available hours: the same ratio, since available hours are hours worked. Before comparing two rates, check the denominator: it may or may not include training and sick leave. Without timesheets, start from invoices: hours billed over twelve months ÷ hours worked.
This rate matters more than salary. At €75 per billed hour and €80,850 of costs, only the number of hours sold changes. The chart places that price on the cost curve, from 60% to 85% utilization.
Without a single salary changing, fifteen utilization points separate a €11,550 loss from a €5,775 profit.
Public holidays, annual day contracts, 39-hour weeks: adjusting the calendar
Of France’s 11 statutory public holidays, 9 fall on a weekday in 2026 and 7 in 2027: count the ones the business actually takes off (8 in the example, where the firm works one of them). Two cases come up often:
- Executive on an annual day contract (French forfait jours): keep 1,820 hours and 7 hours a day, and enter their rest days in the “Extra days off (French RTT)” field.
- 39-hour week: 2,028 hours paid (39 × 52), 7.8 hours a day, overtime included in gross pay.
Outside France, replace hours paid, vacation and holidays with your own calendar: the rest of the method does not change.
How do you convert an hourly rate to a day rate?
The day rate is the price of one day of work, excluding VAT: the hourly selling rate multiplied by the hours in a day, €84 × 7 h = €588 in the example.
It is the standard pricing unit in consulting, IT and engineering. It can also be calculated directly in days:
Day rate
= hourly selling rate
× hours in a day
= 84 × 7
= €588 excl. VAT
Day rate
= (employment cost
+ overhead)
÷ days sold
× (1 + markup)
= 80,850 ÷ 165 × 1.20
= 490 × 1.20
= €588 excl. VATThree points prevent misunderstandings:
- State the length of the day. The same hourly rate gives €588 for 7 hours and €672 for 8 hours.
- The day rate sold is not the day rate achieved. On a time-and-materials job, the two are the same. On a fixed-price job, the achieved day rate is the price divided by the days actually spent.
- The average day rate is measured after the fact. Revenue ÷ days billed: that is the figure to compare with the cost per day, €490 in the example.
A fixed-price job that overruns shows the difference.
A four-day overrun, 20% more time, cut the achieved day rate by 17%: the entire margin.
How do you convert a salary into an hourly wage?
On a French 35-hour week, the gross hourly wage is the monthly gross salary divided by 151.67, or the annual salary divided by 1,820: €2,500 a month is €16.48 gross an hour.
Full time, 35 h
2,500 ÷ 151.67 = €16.48 gross
Annual salary
30,000 ÷ 1,820 = €16.48 gross
Part time, 28 h
28 × 52 ÷ 12 = 121.33 h a month
39 h, with overtime
151.67 + 17.33 × 1.25 = 173.33 h
2,800 ÷ 173.33 = €16.15 grossOn a 39-hour week, the employee is paid for 169 hours a month, including 17.33 hours of overtime. With the 25% premium (the French statutory rate absent a collective agreement), those hours are worth 21.66 hours at the base rate: that is why you divide by 173.33, not 169.
These rates are gross. According to the simulator of URSSAF, the French agency that collects social contributions, net pay before income tax is around 78% of gross between the French minimum wage (SMIC) and €6,000 a month. For an exact amount, use the official URSSAF simulator (in French), which goes from gross to net pay and total employer cost. A wage rate is not a selling price: it leaves out employer charges, unsold hours, overhead and margin.
Which public benchmarks can you use to check your assumptions?
Two official French sources can check the calculation: statutory working time and employer contributions by salary level. Both were checked at the source on November 10, 2026.
French statutory working time
| Benchmark | Value | Legal text |
|---|---|---|
| Statutory working week | 35 hours | French Labor Code, art. L. 3121-27 |
| Monthly basis for full time | 151.67 hours (35 × 52 ÷ 12) | Art. L. 3242-1 |
| Annual reference duration | 1,607 hours | Art. L. 3121-41 |
| Paid vacation | 2.5 working days (Monday to Saturday) a month, 30 at most a year, or 25 days counted Monday to Friday | Art. L. 3141-3 |
| Statutory public holidays | 11 a year, of which 9 fall Monday to Friday in 2026 and 7 in 2027 | Art. L. 3133-1 |
| Annual day contract | 218 days at most | Art. L. 3121-64 |
| Overtime, absent an agreement | +25% for the first eight hours, +50% after | Art. L. 3121-36 |
| Gross hourly minimum wage (SMIC) | €12.31 since June 1, 2026, or €1,867.02 a month for 35 hours | Order of May 22, 2026 |
French employer contributions, by salary
France has no single employer contribution rate, only one per salary level: the general sliding-scale reduction cuts contributions on salaries below 3 times the SMIC, most of all at the SMIC itself. For a full-time permanent contract in a company with 30 employees, the URSSAF simulator gives the following rates for non-cadre employees and for cadres (the French status of managers and professionals):
| Monthly gross salary | Non-cadre | Cadre | Cost per hour paid, non-cadre |
|---|---|---|---|
| €1,867.02 (SMIC) | 7.0% of gross | 8.7% of gross | €13.17 |
| €2,500 | 27.0% | 28.7% | €20.94 |
| €3,000 | 34.1% | 35.7% | €26.52 |
| €3,500 | 37.9% | 39.5% | €31.81 |
| €4,000 | 39.9% | 41.6% | €36.91 |
| €5,000 | 41.8% | 43.1% | €46.74 |
| €6,000 | 43.9% | 45.0% | €56.92 |
The curve shows why a single rate misleads.
Use the closest row: 39.5% for a cadre at €3,500, rounded to 40% in the example. Applying 45% near the SMIC greatly overstates the cost; 25% for a cadre understates it. The payroll cost calculator uses 35%, as the average rate for a mixed team.
The last column divides total cost by hours paid: it is not yet a cost rate. The exact rate is in your payroll records: employer contributions ÷ gross salary. Outside France, use your own payroll data: these rates do not apply elsewhere.
Hourly labor cost, by sector
Eurostat and INSEE (the French national statistics office) publish the average cost of an hour worked by sector: €55.8 in 2025 in professional, scientific and technical activities in France. The engineer in the example costs €58,800 ÷ 1,540 hours = €38.18 per hour worked. This average mixes occupations, seniority and regions, executives included: it is an order of magnitude. Other sectors are in the cost price guide.
What about market day rates?
To our knowledge, no official French statistic gives day rates by occupation. The rate tables in circulation come from freelance platforms and umbrella companies, based on their own assignments; we use none of them, as their methods cannot be verified.
Which mistakes distort an hourly rate?
The costliest mistakes come from the divisor: hours paid instead of hours sold, an assumed utilization rate, non-billable staff left out; the others concern charges, the margin base and the calendar.
| Mistake | What it costs in the example | The fix |
|---|---|---|
| Dividing by hours paid | €80,850 ÷ 1,820 h = €44.42 instead of €70: understated by more than a third | Divide by hours sold |
| Assuming the utilization rate | 10 days without billable work cost €5,250 of profit | Measure it over twelve months of timesheets, per person |
| Forgetting non-billable staff | Their salaries are part of the €264,600 of overhead: leaving them out understates the cost of every hour sold | Count them as overhead, carried by the billable staff’s hours sold |
| One charge rate for everyone | From 7% of gross at the SMIC (non-cadre) to 45% at €6,000 (cadre) | Use the rate for each salary level |
| Confusing markup and margin | A 20% markup on cost is only a 16.7% margin on price | State the base: cost or price |
| Judging a fixed price by the day rate sold | 20% more days, a 17% lower achieved day rate | Track the achieved day rate |
| Keeping the rate from one year to the next | Two fewer weekday public holidays in 2027 than in 2026 | Redo the calculation with every budget |
A cost rate is not a market price
The hourly cost rate tells you what an hour costs you, not what the client is willing to pay. It is a floor: if the market pays €100 for an hour that costs you €70, selling at €84 leaves money on the table.
If the market pays less than your cost, the lever is not price: it is utilization, overhead, team mix or the choice of jobs. Finally, one extra hour, once salaries and overhead are paid, costs almost nothing: an argument for a one-off job, never for building a rate card.
Tracking utilization and margin by project
The rate is calculated once a year, but what keeps it right changes every week. Three metrics are enough: utilization per person per month, the achieved day rate (billed ÷ days spent) and the margin by project (billed − days spent × cost per day). Time entries live in the project management system or the ERP, invoices in the accounting system.
With fewer than ten people, a monthly PivotTable is enough. Beyond that, a Power BI dashboard brings the data together. See the management dashboard, the sales dashboard and Power BI and your ERP. Utilization has its own entry in the KPI library.
The owner in the typical scenario did not need a better spreadsheet but the right divisor: the quote now starts from €70, not €32.
Frequently asked questions
What salary does a €600 day rate support?
About €43,200 gross a year, or €3,600 a month, with the cost structure of the example. The calculation: €600 × 165 days ÷ 1.20 for the markup, minus €22,050 of overhead, all divided by 1.40 for French employer charges. Gross salary is only about 44% of the day rate; the rest covers charges, overhead and margin.
How do freelancers calculate their day rate?
The starting point is the same: target revenue ÷ days actually billed in the year, not working days. Contributions and tax then depend on your legal status and country. In France (micro-entreprise, sole proprietorship, EURL, SASU, umbrella company), the official URSSAF simulators listed in the sources take you to net income.
What is a good utilization rate?
No official statistic gives it by occupation. The useful benchmark is your break-even utilization: full cost ÷ (billed hourly rate × hours worked). In the example, it is 70% at the current price of €75 and 62.5% at the target price of €84; above it, every point gained is profit.
What is the difference between a cost rate and a billable rate?
The cost rate is what an hour sold costs you: salary, employer charges and overhead, divided by hours sold. The billable rate is what you charge: the cost rate plus your markup. In the example, €70 and €84. The loaded hourly cost, €32.31 per hour paid, is neither.
