Power BI October 2026 update: what changes and what to do

Published · Updated · 7 min read

Dylan Arnaud, founder of Datafuji

The October 2026 Power BI update adds two visuals in preview: a native Gantt chart and a list slicer in dropdown mode, the latter out of preview in November. Three tweaks are useful right away: a chart background colored by a measure, axes chosen by the reader and bookmarks that keep column widths.

What’s new in Power BI in October 2026?

Microsoft lists nine Power BI features in October 2026, in five groups (Copilot and AI, reporting, modeling, mobile, other), two of them in preview, and none requires action this month. Nothing is retired, and existing reports look the same.

FeatureStatusForWhat to do
Native Gantt chartPreviewAuthors, project managersTest on a real schedule
List slicer as a dropdownPreview (generally available in November)Authors, readersReplace long filters
Plot area backgroundGenerally availableAuthorsColor a chart when it falls below its threshold
Hierarchical axis and field parametersGenerally availableAuthors, readersOne chart, several axes to choose from
Personal bookmarks and column widthGenerally availableReadersNothing: it’s automatic
Custom visuals added by an AI agentGenerally availableAuthors who use an agentCheck the visuals policy
Continuous capacity usage reportingGenerally availableFabric capacities onlyNo setting to change
Mobile page iconGenerally availableAuthorsCheck field teams’ reports
Info header in TeamsGenerally availableReadersNothing: it’s automatic

The neighboring months are covered in the September 2026 and August 2026 updates.

How do you create a Gantt chart in Power BI?

The Gantt chart is now a standard Power BI visual, in preview. Each row is a task whose bar shows its duration on a timeline, with progress and milestones for key dates.

To try it: File > Options and settings > Options > Preview features, check the Gantt visual, then restart Power BI Desktop. The visual expects a task, a start and an end, grouped into up to three levels (phase, team, project).

The project schedule, often kept in a separate Excel file, can then be read in the same report as the figures, with no AppSource visual (Microsoft’s visuals marketplace) to get approved. You can set the timeline bounds and colors by category, add columns (owner, status) and a zoom axis to focus on a period.

Accurate progress, from task to phase

Progress is a measure. The trap is averaging percentages per task: at the phase level, a 2-hour task counts as much as a 200-hour task. A ratio of sums is better:

Progress % =
DIVIDE (
    SUM ( Tasks[Hours done] ),
    SUM ( Tasks[Hours planned] )
)

Assembly phase: one 200-hour task 25% done, one 2-hour task complete. The average shows 62.5%; the ratio of sums, 52 hours out of 202, or 26%.

A second trap, specific to the visual: the documentation states that a milestone is drawn when the end date is blank. A task whose end date has not been entered yet therefore shows as a diamond, like a deadline.

Gantt chart of an installation project, from October to December 2026. The Preparation phase is 100% complete. In the Assembly phase, the 200-hour Fitting and wiring task is 25% done and the 2-hour Visual check is complete: the phase shows 26%, or 52 hours done out of 202 planned, not 62.5%, the average of the two percentages. In the Commissioning phase, the Adjustments task, whose end date is blank, is drawn as an orange diamond on December 3, like a milestone, whereas the only real milestone is Commissioning, on December 15.Gantt chart of an installation project, from October to December 2026. The Preparation phase is 100% complete. In the Assembly phase, the 200-hour Fitting and wiring task is 25% done and the 2-hour Visual check is complete: the phase shows 26%, or 52 hours done out of 202 planned, not 62.5%, the average of the two percentages. In the Commissioning phase, the Adjustments task, whose end date is blank, is drawn as an orange diamond on December 3, like a milestone, whereas the only real milestone is Commissioning, on December 15.
A blank end date turns a task into a false milestone; progress is calculated on hours, not as an average.

Before sharing, give every task a forecast end date. The visual accepts 1,000 rows at most: beyond that, split by project. For linked tasks, the partner visual Power Gantt Chart, covered in the November 2025 update, shows finish-to-start dependencies.

How do you filter a long list without losing half the page?

The list slicer can collapse into a dropdown: the selected values stay visible as pills, which the reader removes with one click without reopening the list. In preview in October, this mode became generally available with the November 2026 update.

The dropdown keeps item formatting, and you can adjust the panel size and format the search box. When the pills no longer fit, a count pill shows how many more values are selected. A filter on 400 clients, which used to take up half the page, now fits on one line.

Two versions of the same report page, with a filter on clients. On the left, the open list slicer, with checkboxes and a scroll bar, takes up half the page and squeezes the column chart. On the right, in dropdown mode, the filter fits on one line: two pills, Client Arnoux and Client Bertin, then a “+5” pill for five other selected clients; the column chart takes the full width. Below, after “Select all,” two orange pills “Not (Client Dupuis)” and “Not (Client Ernst)”: these two clients are excluded, not the only ones shown.Two versions of the same report page, with a filter on clients. On the left, the open list slicer, with checkboxes and a scroll bar, takes up half the page and squeezes the column chart. On the right, in dropdown mode, the filter fits on one line: two pills, Client Arnoux and Client Bertin, then a “+5” pill for five other selected clients; the column chart takes the full width. Below, after “Select all,” two orange pills “Not (Client Dupuis)” and “Not (Client Ernst)”: these two clients are excluded, not the only ones shown.
Collapsed, the filter fits on one line; a “Not” pill flags an excluded value, not a selected one.

The trap: after “Select all,” unchecked values become “Not (value)” pills. A reader in a hurry thinks the report is filtered to just these clients, when they are the only ones excluded. One more setting: “Show selected first” moves the selected values to the top of list slicers and button slicers.

Which formatting tweaks are available right away?

In October 2026, three formatting changes are generally available, with no preview to turn on: a colored background behind the data, axes the reader chooses and personal bookmarks that remember column widths.

A chart background that flags a variance

Eight chart types (bar, column, line, area, combo, ribbon, waterfall, scatter) accept a solid background, under Plot area in the Format pane. It can be driven by a measure that returns a color:

Margin background =
IF (
    [Margin %]
        < [Margin % target],
    "#FDF1E3",
    "#FFFFFF"
)

The trap: the plot area is the background of the whole chart, so it only takes one color at a time, not one per month. To flag a single month, color the columns.

One chart, several axes for the reader to choose from

Bar, column and line charts show a multi-level axis (for example, year then month) when several fields are placed on it. These fields can come from a field parameter, that is, a list of columns the reader chooses from. Through a slicer or “Personalize this visual,” they switch from a customer view to a sales rep view in the same chart.

Bookmarks that keep your columns

A personal bookmark (a view of the report that the reader saves to come back to later) now preserves resized and reordered columns in tables and matrices. The FP&A analyst (contrôleur de gestion in France) gets their account labels back at the right width. Readability rules are in the Power BI dashboard guide.

What does AI change for building reports?

With Skills for Fabric, the skills library Microsoft publishes for AI agents, an agent can now add a custom visual to a report. It can also bind it to data, format it and check the result.

It starts from the visuals already imported into the report, or helps pick one on AppSource. An SME that hands its reports to an agent should therefore first check which visuals its admin allows. This agent is not Copilot, the assistant built into Power BI; how to prepare data for Copilot is covered in the Copilot in Power BI guide.

Who is affected by continuous capacity reporting?

Continuous usage reporting only affects companies on a Fabric capacity (computing power reserved for the company, billed by the hour or by subscription, SKUs F2 to F2048). During a long refresh, the semantic model (the published dataset) reports what it consumes as it goes, and no longer only at the end. With Pro licenses, nothing changes, and there is no setting to adjust.

The benefit lies in surge protection, which the admin turns on. With earlier warning, it rejects background operations, such as refreshes, before they start rather than midway through. Figures published by Microsoft for August, measured in one region:

Background operationsBeforeAfter
Rejected late, while running23%13%
Rejected early, before starting5%12%
Delayed11%16%

The trap is reading this mainly as fewer rejections: the total barely moves (from 28% to 25%). What changes is the timing: rejections come earlier, so less compute is wasted. Licenses are compared in Power BI pricing, and data models are covered in the Power BI data model guide.

What’s new on mobile and in Teams?

Page tabs show an icon when the page has a mobile layout, and a Power BI tab in Teams shows the time of the last refresh in its header.

Tab bar of a five-page Power BI report. Summary, Projects and Clients carry a small blue phone icon: these pages have a mobile layout. Margin detail and Stock, underlined in orange here, do not: on a phone, they will show scaled down and still need adapting.Tab bar of a five-page Power BI report. Summary, Projects and Clients carry a small blue phone icon: these pages have a mobile layout. Margin detail and Stock, underlined in orange here, do not: on a phone, they will show scaled down and still need adapting.
A glance at the tabs is enough to see which pages still need adapting for phones.

Pages without the icon will open scaled down on a site manager’s phone: those are the ones to adapt.

In Teams, the header also shows the content’s name and its sensitivity label (the sensitivity level chosen by the company, for example “Confidential”). This applies to reports, dashboards, scorecards and apps, including org apps: with the last refresh time on display, the team can see whether the figures are from this morning.

Where should an SME start?

For an SME, three steps are enough, in this order: first what is generally available, then the previews, always on a copy of the report so nothing changes for readers.

  1. Replace long filters with the dropdown, now generally available.
  2. Check the mobile pages of reports read in the field.
  3. Test the Gantt chart on a copy of the schedule, after giving every task an end date.

At the next management meeting, a single report is enough: the schedule next to the margin, with a filter on one line. The other months are collected in Power BI updates, and the Power BI guide shows where the tool fits in running an SME.

Frequently asked questions

Does the native Gantt chart replace the AppSource Gantt visuals?

Not for every use. It is in preview, limited to 1,000 rows, and its documentation does not mention dependencies between tasks. For a simple schedule, it is enough; for linked tasks, a partner visual such as Power Gantt Chart shows finish-to-start dependencies.

Why doesn’t the Gantt chart appear in my Power BI Desktop?

Either the installed version predates October 2026, or the preview feature isn’t turned on. Installed from the Microsoft Store, Power BI Desktop updates itself; otherwise, download the new version, check the option and restart.

Do these features require a specific license?

No. The Gantt chart and the list slicer are standard visuals; sharing follows the usual rules. Only continuous capacity usage reporting requires a Fabric capacity, and the AI agent needs Skills for Fabric installed.

Let’s talk about your reporting.

A 30-minute video call with Dylan Arnaud. You come away with a clear scope and a fixed price.

Dylan Arnaud, Power BI consultant and founder of Datafuji
Dylan ArnaudFounder · your single point of contact