---
title: "OEE calculator: formula, worked example, pitfalls | Datafuji"
url: "https://www.datafuji.com/en/tools/oee-calculator"
lang: en
updated: 2026-11-28
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://www.datafuji.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
---

- [Home](https://www.datafuji.com/en)

- [Tools](https://www.datafuji.com/en/tools)

- OEE calculator

# OEE (overall equipment effectiveness): definition, formula and free calculator

Published November 28, 2026 · Updated November 28, 2026 · 12 min read

[Dylan Arnaud](https://www.datafuji.com/en/about#dylan-arnaud), founder of Datafuji

OEE (overall equipment effectiveness) is the share of planned production time that a machine actually spends making good parts at its ideal rate.

The formula is OEE = fully productive time ÷ planned production time = availability × performance × quality. Example: a line planned for 112 h that turns out the equivalent of 84.1 h of good parts has an OEE of 75.1%.

## Calculate the OEE of a line

The calculator gives OEE, its three factors, OEE on opening time (the French TRG) and the first loss to tackle. Enter a line’s hours and part counts for a shift, a day or a week.

The ideal cycle time is derived from the rate (3,600 ÷ parts per hour); the default values are those of a fictitious stamping line.

Calculator · your figures stay in your browser

Opening time (h)

Planned production time: opening − planned stops (h)

Unplanned stops: breakdowns, changeovers, waiting (h)

Ideal cycle time (s per part)

Parts produced

Good parts, first time right

Availability

87.5%

run time ÷ planned time

Performance

88.4%

actual rate ÷ ideal rate

Quality

97.0%

good ÷ produced

OEE

75.1%

productive ÷ planned time

OEE on opening time

70.1%

productive ÷ opening time

Of 112 h of planned production time, the line produced the equivalent of 84.1 h of good parts. The 27.9 h lost come from unplanned stops (14 h), slowdowns and minor stops (11.3 h) and quality losses (2.6 h). The first loss to tackle: unplanned stops.

## What is OEE?

OEE is the shop-floor metric that combines the three ways of losing production time (stops, slowdowns, defects) into a single percentage, so you know which one to tackle first. In France, it is called TRS (taux de rendement synthétique) and is defined by the French standard NF E60-182.

A typical shop-floor scenario: the team leader says the press “ran well,” the quality manager points to rising scrap, and maintenance reports a cylinder failure. Everyone is right, yet nobody knows what the line lost. OEE puts all three losses into the same unit: hours.

The international standard ISO 22400-2 defines OEE among its KPIs for manufacturing operations management. In practice, however, plants calculate it sometimes against planned production time and sometimes against opening time, hence the section on OEE, TEEP and the French TRG.

Our example line, a fictitious one, stamps sheet-metal parts. Its figures for one week are the calculator’s default values: 120 h of opening time, 10,400 parts produced, 10,090 of them good the first time.

## How do you calculate OEE?

To calculate OEE, start from opening time (the hours the shop is open) and remove, layer by layer, first planned stops (which do not count against OEE), then three families of losses: unplanned stops, slowdowns and poor quality. The fully productive time that remains, divided by planned production time, gives OEE.

| Time | Calculation | Losses removed |
| --- | --- | --- |
| Planned production time | Opening time − planned stops | Preventive maintenance, trial runs, training, scheduled meetings |
| Run time | Planned production time − unplanned stops | Breakdowns, changeovers, waiting for material or operators |
| Net run time | Parts produced × ideal cycle time | Slowdowns and minor stops |
| Fully productive time | Good parts × ideal cycle time | Scrap and rework |

Net run time and fully productive time are not timed with a stopwatch: they are calculated from part counts and the ideal cycle time, which is the time the machine takes to make one part at its nameplate rate.

Each layer gives a factor:

Availability = run time ÷ planned time Performance = net run time ÷ run time Quality = good parts ÷ parts produced OEE = availability × performance × quality = productive time ÷ planned time

A good part is one that is right the first time: a reworked part used up machine time without coming out good, so it counts as a quality loss.

For the stamping line, the waterfall shows this at a glance.

![Waterfall of horizontal bars for one week of the stamping line: 120 h of opening time; 112 h of planned production time after 8 h of planned stops; 98 h of run time after 14 h of unplanned stops, the heaviest loss; 86.7 h of net run time after 11.3 h of slowdowns and minor stops; 84.1 h of fully productive time after 2.6 h of quality losses. OEE = 84.1 ÷ 112 = 75.1%, i.e. 87.5% availability × 88.4% performance × 97.0% quality.](https://www.datafuji.com/img/en/outils-calcul-trs/outils-calcul-trs-01.svg)

*From 112 h planned to 84.1 h productive: each layer removes one family of losses.*

The biggest step is not the last one: unplanned stops cost 14 h, more than five times as much as scrap.

## A worked example, step by step

The stamping line, planned for 112 h in the week, has an OEE of 75.1%: 87.5% availability, 88.4% performance, 97.0% quality. Of the 27.9 h lost, half comes from stops.

The week’s data: 120 h of opening time, including 8 h of planned stops, and 14 h of unplanned stops. The ideal cycle time is 30 seconds (120 parts an hour). The line produced 10,400 parts, of which 10,090 were good the first time.

Planned production time = 120 − 8 = 112 h Run time = 112 − 14 = 98 h Net run time = 10,400 × 30 s = 86.7 h Fully productive time = 10,090 × 30 s = 84.1 h Availability = 98 ÷ 112 = 87.5% Performance = 86.7 ÷ 98 = 88.4% Quality = 10,090 ÷ 10,400 = 97.0% OEE = 84.1 ÷ 112 = 75.1% = 87.5% × 88.4% × 97.0%

You get the same result by counting parts. In 112 h, at 120 parts an hour, the line could have produced 13,440 parts; it produced 10,090 good ones, and 10,090 ÷ 13,440 = 75.1%. This quick calculation gives OEE, but not the cause of the gap.

The 27.9 h lost break down as follows: 14 h of unplanned stops, 11.3 h of slowdowns and minor stops, 2.6 h of quality losses. The first loss to tackle is therefore stops, ahead of speed losses and far ahead of scrap.

That is the whole point of breaking OEE down. A single percentage says the line loses a quarter of its time; the three factors say where to look.

### How do you calculate the performance rate?

The performance rate divides net run time, parts produced × ideal cycle time, by run time. Here: 10,400 × 30 s = 86.7 h over 98 h of run time, or 88.4%.

It measures slowdowns and minor stops (the stops of a few seconds or minutes that nobody logs), not breakdowns. It can also be expressed as a ratio of rates: actual rate ÷ ideal rate, here 10,400 ÷ 98 = 106 parts an hour versus 120.

## OEE, TEEP and the French TRS, TRG and TRE: what is the difference?

The French standard NF E60-182 defines three rates with the same numerator, fully productive time. Only the denominator changes: planned production time for the TRS (OEE), opening time for the TRG, and total calendar time (the whole week, 24 h × 7 = 168 h) for the TRE, close to TEEP (total effective equipment performance).

| Metric | Formula | Example line | What it measures |
| --- | --- | --- | --- |
| OEE (French TRS) | Productive time ÷ planned production time | 84.1 ÷ 112 = 75.1% | The line’s effectiveness when it is scheduled to produce |
| OEE on opening time (French TRG) | Productive time ÷ opening time | 84.1 ÷ 120 = 70.1% | The same, planned stops included |
| TEEP (French TRE) | Productive time ÷ calendar time | 84.1 ÷ 168 = 50.0% | What the equipment could deliver with longer opening hours |

The TRG also equals OEE × loading rate, the loading rate being planned production time ÷ opening time: 75.1% × 93.3% = 70.1%. On the same line, it is therefore always lower than or equal to OEE.

Dividing the same week three ways shows the gap.

![Three bars on the same scale: 168 h of calendar time, 120 h of opening time, 112 h of planned production time. On each, the same 84.1 productive hours are in blue. Divided by calendar time, they give a TEEP (French TRE) of 50.0%; by opening time, an OEE on opening time (French TRG) of 70.1%; by planned production time, an OEE (French TRS) of 75.1%.](https://www.datafuji.com/img/en/outils-calcul-trs/outils-calcul-trs-02.svg)

*Same 84.1 productive hours: 75.1% OEE, 70.1% on opening time (TRG), 50.0% TEEP.*

The numerator stays the same; only the reference time changes, and with it the reported figure.

### OEE does not always have the same denominator

OEE’s denominator varies from one plant to another: sometimes it is planned production time, as in the French TRS, sometimes opening time, as in the TRG.

Comparing one site’s OEE with another site’s OEE on opening time, or with an OEE whose denominator is unknown, is the most common mistake. It does not matter which rate you publish, as long as it is always the same one and its definition is written down.

## Which pitfalls distort OEE?

A wrong OEE is almost always one that looks too good: most mistakes inflate the figure without the line running any better. Five pitfalls come up again and again, each quantified here on the stamping line.

### Using the observed rate as the reference

If you use the observed cycle time as the reference, 98 h ÷ 10,400 parts = 33.9 s, performance is 100% by definition. OEE goes from 75.1% to 84.9%, and the 11.3 h of slowdowns disappear.

The diagram puts the two calculations side by side.

![Two OEE calculations for the same week, on a scale from 70% to 90%. With the 30-second ideal cycle time, the nameplate rate of 120 parts an hour, performance is 88.4%, the 11.3 h of slowdowns remain visible and OEE is 75.1%: right. With the observed cycle of 33.9 seconds, i.e. 98 h for 10,400 parts, performance rises to 100%, slowdowns drop to 0 h and OEE to 84.9%, very close to the 85% benchmark: wrong.](https://www.datafuji.com/img/en/outils-calcul-trs/outils-calcul-trs-03.svg)

*Reference taken from the observed rate: OEE gains nearly 10 points, the line gains nothing.*

The reference is the machine’s nameplate rate for that product, from the ERP routings or the manufacturer, not the rate actually achieved that day.

### Filing unplanned stops as planned stops

Declaring 6 h of changeovers as “planned” brings planned production time from 112 down to 106 h and unplanned stops from 14 to 8 h. Run time stays at 98 h, but availability rises to 92.5% and OEE to 79.3%, without a single extra part.

The fix: a written list of planned stops, and nothing else in it.

### Counting reworked parts as good

If 150 of the 310 nonconforming parts are reworked and then counted as good, quality goes from 97.0% to 98.5% and OEE from 75.1% to 76.2%.

Those parts consumed machine time without coming out right the first time, so they remain a quality loss. What they cost shows up in the [cost price](https://www.datafuji.com/en/tools/cost-price-calculator), calculated on good parts.

### Averaging OEEs

A shop’s OEE is not the average of the OEEs of its lines or its days. Suppose the shop also runs a rework press, planned for 16 h, that turns out 6 productive hours: its OEE is 37.5%.

The chart compares the simple average with the true calculation.

![Stamping line: 84.1 productive hours out of 112 h planned, OEE of 75.1%. Rework press: 6 productive hours out of 16 h planned, OEE of 37.5%. The bars are scaled to planned production time. The shop total, 90.1 productive hours out of 128 h planned, gives the true OEE of 70.4%; the average of the two OEEs shows 56.3%, a trap.](https://www.datafuji.com/img/en/outils-calcul-trs/outils-calcul-trs-04.svg)

*The average of the two OEEs shows 56.3%; the shop’s true OEE is 70.4%.*

The press, planned for 16 h, carries one-seventh the weight of the line, planned for 112 h, yet the simple average gives them equal weight. Add up the productive times and the planned times, then divide: 90.1 ÷ 128 = 70.4%.

### Classifying minor stops differently from one line to another

A two-minute stop logged as downtime on one line and left as a speed loss on another does not change OEE. But the loss shifts from performance to availability: one line seems to break down, the other to slow down. Set a common threshold, for example five minutes, below which a stop counts as a minor stop.

## What is a good OEE?

No standard defines a good OEE. The 85% figure known as “world-class” OEE comes from Seiichi Nakajima, who introduced TPM (total productive maintenance) and, in 1984, set it as a minimum target.

Award-winning Japanese plants exceeded it. This 85% is the product of three targets: 90% availability, 95% performance, 99% quality (0.90 × 0.95 × 0.99 = 84.6%).

According to Vorne Industries, an OEE software vendor, most plants are closer to 60%, and more companies are below 45% than above 85%. These benchmarks apply to discrete manufacturing, not to process industries such as chemicals.

Placed on this scale, the example line looks different.

![OEE scale from 0 to 100%. Benchmarks according to Vorne Industries: 45%, below which there are more plants than above 85%; about 60%, the level of most plants. Nakajima’s benchmark (1984): 85%, the product of 90% availability, 95% performance and 99% quality. The example line is at 75.1% (87.5% × 88.4% × 97.0%). Gap to each benchmark, in points: availability −2.5, performance −6.6, the largest, quality −2.0. In hours, unplanned stops (14 h) remain the biggest loss.](https://www.datafuji.com/img/en/outils-calcul-trs/outils-calcul-trs-05.svg)

*At 75.1%, the line beats the typical level; in points, performance keeps it furthest from 85%; in hours, stops do.*

These benchmarks help you place a line, not judge it. They depend on the product, batch sizes and what each plant counts as planned production time. A small-batch line that changes tools several times a shift will not reach the OEE of a line that makes the same part all year.

The only reliable benchmark is your own history, calculated with the same definition: compare a line with itself over time, and sites with each other only if they apply the same formula.

## How do you improve OEE?

To improve OEE, tackle the biggest loss in hours first, not the factor furthest from its benchmark. On the example line, that means the 14 h of unplanned stops, before slowdowns.

Nakajima grouped losses into six big losses, two per factor, each with its own levers.

| Factor affected | The six big losses | Usual levers |
| --- | --- | --- |
| Availability | Breakdowns; setups and changeovers | Preventive maintenance, SMED (single-minute exchange of die), tracking MTBF (mean time between failures) |
| Performance | Idling and minor stops; reduced speed | On-the-spot logging of minor stops, standardized settings, material supply to the line |
| Quality | Process defects; startup rejects | First-article inspection, root-cause analysis of scrap, written work instructions |

On the example line, stops account for 14 h, slowdowns for 11.3 h and quality losses for 2.6 h: eliminating all scrap would recover 2.6 h, while cutting stops by a third would recover nearly five. To analyze breakdowns in detail, use the [MTBF and MTTR calculator](https://www.datafuji.com/en/tools/mtbf-mttr-calculator).

A higher OEE is not an end in itself: producing more than customers order fills up inventory. The goal is to free up capacity where it is short: at the bottleneck, the machine that limits the throughput of the whole line.

## How do you track OEE every week?

OEE is tracked by line and by week, with its three factors and its losses by cause, using a definition written once for all sites, then automated.

The definition comes down to four decisions, to be written down before you measure anything:

- The list of planned stops: what is excluded from planned production time, and nothing else.

- The ideal cycle time of each product on each machine, taken from the ERP routings.

- The good-part rule: right the first time, rework excluded.

- The minor-stop threshold: below it, a stop counts against performance.

Then a Power BI dashboard connects to the ERP, the MES (manufacturing execution system) or shop-floor data entry. It shows OEE by line, stops by cause and scrap, and calculates the shop total from cumulative times, never by averaging.

The production KPIs that surround it are covered in our [manufacturing dashboard](https://www.datafuji.com/en/industries/manufacturing) guide. OEE also has its own entry in the [KPI library](https://www.datafuji.com/en/kpi#kpi-trs), next to the scrap rate.

In the end, the Monday meeting no longer debates whether the press “ran well”: it sees 14 h of stops, which ones they were, and decides who deals with them.

## Frequently asked questions

### Can OEE exceed 100%?

Not if it is calculated correctly. Performance above 100% signals an ideal cycle time that is too long: with 36 seconds instead of 30, the example line would show 106% performance. Fix the reference instead of celebrating the result; the calculator rejects that case.

### Should you enter the production rate or the cycle time?

The calculator asks for the ideal cycle time, in seconds per part. If you know the nameplate rate, divide 3,600 by it: 120 parts an hour gives 30 seconds. Use the manufacturer’s rate or the one in your routings, never the rate actually achieved that day.

### Over what period should OEE be calculated?

By shift for the team running the line, by week for the production manager, by month for senior management. The shorter the period, the more a single stop moves the figure: use the shift figure to react and the weekly figure to decide.

### Which machines should you measure OEE on first?

The bottleneck, the machine that limits the whole line: an hour gained at the bottleneck is an hour gained for the whole plant; anywhere else, it does not produce a single extra part. Then extend the measurement to the neighboring machines.

### How do you calculate OEE in Excel?

One row per shift or per day, six columns: opening time, planned stops, unplanned stops, cycle time, parts produced, good parts. Calculate productive time row by row, sum the columns, then divide the totals. Weekly OEE is calculated from the totals, not by averaging daily OEEs.

Planned time (h) = opening − planned stops Productive time (h) = good parts × cycle (s) ÷ 3,600 Weekly OEE = SUM(productive time) ÷ SUM(planned time)

If the cycle time varies from one product to another, use one row per product: the week’s productive time is then the sum of good parts × cycle for each product.

Other calculators serve the shop floor and the warehouse. The [MTBF and MTTR](https://www.datafuji.com/en/tools/mtbf-mttr-calculator) calculator measures a piece of equipment’s reliability and availability from its failure log. The [OTIF and fill rate](https://www.datafuji.com/en/tools/otif-calculator) calculator gives the share of orders delivered on time and in full. The [inventory turnover](https://www.datafuji.com/en/tools/inventory-turnover-calculator) calculator gives days inventory outstanding and days of cover.

Sources

- AFNOR (French standards body), [NF E60-182, Moyens de production. Indicateurs de performances. TRS, TRG, TRE](https://www.boutique.afnor.org/fr-fr/norme/nf-e60182/moyens-de-production-indicateurs-de-performances-taux-de-rendement-synthetique-t/fa120534/513), in French, May 2002, in force, accessed November 10, 2026.

- ISO, [ISO 22400-2:2014 (amended 2017), Automation systems and integration. Key performance indicators (KPIs) for manufacturing operations management. Part 2: Definitions and descriptions](https://www.iso.org/standard/54497.html), the standard that defines OEE among its indicators, accessed November 4, 2026.

- Vorne Industries, [World-Class OEE](https://www.oee.com/world-class-oee/) (85% benchmark and its breakdown, based on Seiichi Nakajima, Introduction to TPM, 1984 for the Japanese edition, 1988 for the English translation published by Productivity Press; benchmarks valid for discrete manufacturing; typical levels around 60%) and [The Six Big Losses](https://www.oee.com/oee-six-big-losses/), accessed November 20, 2026.

- MES Consulting, [Calcul du TRS, TRG, OEE](https://www.kpi-trs.com/calcul-du-trs), in French (TRG = TRS × loading rate; no single convention for the OEE denominator, measured against planned production time or opening time; TEEP and TRE), accessed November 20, 2026.
